Laserfiche WebLink
SANITATION • HYDRAULIC • AND PROCESSING EQUIPMENT <br />SHAPE INC. Page 1of 2 <br />___________________________________________ <br /> Travis Headen <br />QUOTATION DOES NOT INCLUDE ANY SALES OR USE TAX PAYABLE UNDER ANY STATE OR FEDERAL STATURE. THIS <br />QUOTATION PRICE IS FOR MATERIAL LISTED ABOVE. ANY ADDITIONS OR MODIFICATIONS THAT BECOME NECESSARY FOR <br />APPROVED SUBMITTALS, UPON AWARDING OF THIS CONTRACT, MAY RESULT IN NECESSARY PRICE CHANGES. <br />NOTE: ITEMS NOT SPECIFIED ON THIS QUOTATION ARE NOT INCLUDED IN OUR PRICE AND ARE TO BE SUPPLIED BY <br />OTHERS. PRICES ARE FOR IMMEDIATE ACCEPTANCE AND SUBJECT TO CHANGE WITHOUT NOTICE. Rev. 11/22 <br />SALE SUBJECT TO MANUFACTURERS STANDARD TERMS AND CONDITIONS. 30% Re-stocking fee. <br />PLEASANTON SACRAMENTO STOCKTON <br />3825 Hopyard Road #195 2356 Gold Meadow Way #270 119 Val Dervin Parkway #2 <br />Pleasanton, CA 94588 Gold River, CA 95670 Stockton, CA 95206 <br />Phone (925) 485-9720 Phone (916) 309-4132 Phone (209) 234-5909 <br />TO: City of Pleasanton DATE: 27-Aug-24 <br />QUOTE #: 115057 <br />JOB: Pleasanton Turnout T-4 Booster Pump <br />Station <br />LOCATION: Pleasanton, CA <br />ATTN: Bill Carlson/Joe Sinacori PHONE: <br />Fax: <br />WE ARE PLEASED TO QUOTE ON THE FOLLOWING EQUIPMENT SUBJECT TO CONDITIONS PRINTED ON THE BACK HEREOF, F.O.B. FACTORY <br />THESE CONDITIONS MAY BE CHANGED ONLY BY A WRITTEN F.F.A. TO FIRST DESTINATION <br />STATEMENT SIGNED BY AN OFFICER OF SHAPE, INCORPORATED. <br />QTY ITEM PRICE <br />T-4 Turnout Packaged Booster Pump Station <br />VSS, inc/ MCI-Flowtronex Packaged Booster Pump Assembly <br />See Below for Scope Overview – Each individual section provides complete <br />scope package <br />1 Seismic Calculations and Engineering <br />1 <br />1 <br />PLC programming <br />Lot: Factory Performance Test <br />1 Field Performance Testing and Start Up <br />1 Lot: Assembly Assistance & Training As Specified <br />1 Lot: Documents, O&Ms, & Freight <br />Total For Above Equipment: $1,170,000 <br />NOTES: <br />1.Price includes freight: F.F.A. <br />2.Price does not include any applicable taxes <br />3.Price does not include: installation, equipment unloading, anchor bolts, foundation <br />Page 177 of 658