Laserfiche WebLink
Turnout T-4 Booster PS – Request for Value Engineering <br />Addendum No. 1 Page 3 <br />4.Bid Form <br />The Bid Form is modified to add the “Investigation of Existing SCADA System” line <br />item. See below for the updated Bid Form: <br />Item Price <br />Engineering & Submittals $ <br />Pumps & Mechanical $ <br />Enclosure $ <br />Electrical $ <br />Instrumentation & Controls $ <br />RTU and Integration 1 $ <br />Investigation of Existing SCADA System 2,3 $ 60,000 (Allowance) <br />Delivery & Startup $ <br />Contingency $ <br />Total Price $ <br />Alternative #1 TESCO RTU and Integration $ <br />1)Items excluded in Section 3 above shall be included in the RTU and Integration Bid Item. <br />2)Scope of Allowance item for investigation is described in Section 3 above. <br />3)Compensation under the Allowance shall only be made based on written authorization from <br />the City. <br />145,000.00 <br />Tesco RTU and Integration included <br />0 <br />70,000 <br />300,000 <br />250,000 <br />1,170,000 Tesco has scada configuration included <br />Using Tesco <br />40,000 <br />240,000 <br />125,000 <br />Page 179 of 658