Laserfiche WebLink
Overview <br />Booster Skid Package. Shape is designated the single supplier of the unit and accepts unit <br />responsibility for coordina�on of all equipment Supplier including but not limited to pumps, <br />piping, valves, controls, electrical distribu�on, drives, instrumenta�on, and building enclosure. <br />Addi�onal informa�on provided in the detailed scope sec�on. <br />Site Ready Sta�on Shelter <br />Heavy-Duty, Fiberglass Sta�on Shelter 14FT Wide x 28FT Long x 10FT <br />UV Stable Exterior for Added Protec�on Against Corrosion and Solar Bleaching of Shelter <br />Color <br />Color: Custom per Customer Specifica�on (Confirm at Time of Order) <br />Fully Gasketed, Leak Proof Roofing and Siding Panels w/ Noise reducing insula�on <br />HVAC Climate Control 480/3/65 5ton/9Kw Bard HVAC <br />Gabled Roof w/ Pump Access for Easy Crane Removal and Servicing <br />Electrical <br />Meter Socket Panel w/ pull box <br />Square D Service entrance w/ MTS – 3R Rated, Safety Switch, double throw non fusible <br />Temp Generator receptacle <br />QTY (1) 400A 600V Rated Manual Transfer Switch for Total System Overcurrent <br />Protec�on and Single Point Power Connec�on <br />QTY (5) Interior, Energy Efficient, Long Las�ng, Instant-On LED lights with a Set of Three- <br />Way Light Switches <br />QTY (6) Exterior, Energy Efficient, Long Las�ng, Instant-On LED lights with a Set of Three- <br />Way Light Switches <br />QTY (4) Customer Use 15AMP GFCI Receptacle for Convenient, Readily Available Power <br />QTY (1) Dedicated 120/240VAC 10KVA Power Zone for All Shelter Low Voltage Power <br />Requirements Including Extra Breakers for Customer Use <br />VFD Main Panel (MCC) <br />UL 508a Listed Control Panel Custom Engineered & Manufactured in Same Facility as <br />Pump Sta�on <br />Page 180 of 658