My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16182 Gothard Street, Unit I <br />Huntington Beach, CA 92647 <br />Tel: 714-847-5957 / Fax: 714-847-5958 <br />16182 Gothard #I Huntington Beach Ca. 92647 / Office 714-847-5957, Fax 714-847-5958 <br />Pumping Station Specialists <br />CA Lic# 665995 <br /> INT.____________ <br />10IN Pump Globe Check Valves with Corrosion and Abrasion Resistant Fusion Bonded Epoxy, <br />SS Disc, and Heavy-Duty Spring to Reduce Hydraulic Shock <br />Station Isolation Valving <br />•316SS Threaded Ball Valves, 1.5IN and Below <br />Station Pressure Relief and Surge Anticipating Valve <br />Skid <br />•Fusion Bonded Epoxy Cla-Val 52-03 8IN Station Pressure Relief and Surge Anticipating Valve with <br />Corrosion Mitigating 316SS Internals, Bronze Piloting, Piped to Inlet Manifold with Isolation Butterfly <br />Valve w/Lever Operator, SS Disc, EPDM Elastomers, and Bonnet Quick Air Purge Ball Valve <br />•Reinforced, Custom, Carbon Steel Pump Skid Not to Exceed 14’ x 28’ Footprint <br />o Fabricated Using Heavy Duty, High Strength Structural Channel, Tubing, and Plate <br />o Fully Seal Welded Pump Skid Deck Plate <br />o Integral High Thrust Structural Pipe Supports <br />o Self-healing, Corrosion Reducing, Zinc Powder Coat Primer <br />o Wet Painted Skid <br />o Drain with Drain Line <br />o Corrosion and Wear Resistant Zinc Hardware <br />o Includes Seismic Anchoring Calculations as Well as Associated Anchors <br />NOTE: Any changes made per customer request that increase the overall system footprint past what is stated <br />above may be subject to a change order. <br />Site Ready Station Shelter <br />•Construction <br />o Heavy-Duty, Fiberglass Station Shelter, 14 x 28 <br />UV Stable Exterior for Added Protection Against Corrosion and Solar Bleaching of Shelter <br />Color <br />Color: Custom per Customer Specification (Confirm at Time of Order) <br />Fully Gasketed, Leak Proof Roofing and Siding Panels <br />All Shelters are Mounted to the Pump Skid and Wired Prior to Shipping <br />o Gabled Roof w/ Pump Access for Easy Crane Removal and Servicing <br />o Vandalism Resistant, Pad-Lockable Access Doors with Heavy Duty Doorstop <br />o 25 Year Shelter Only Warranty <br />•Internal Climate Control <br />o 480/3/60 5ton/9Kw Bard HVAC Unit <br />o Noise Reducing, Thermally Protective Insulation for Non-Disruptive, Energy Efficient Performance <br />o Dehumidifier <br />•Electrical <br />o QTY (1) 400A 600V Rated Manual Transfer Switch for Total System Overcurrent Protection and <br />Single Point Power Connection <br />o QTY (5) Interior, Energy Efficient, Long Lasting, Instant-On LED lights with a Set of Three-Way <br />Light Switches <br />o QTY (6) Exterior, Energy Efficient, Long Lasting, Instant-On LED lights with a Set of Three-Way <br />Light Switches <br />o QTY (4) Customer Use 15AMP GFCI Receptacle for Convenient, Readily Available Power <br />Page 190 of 658
The URL can be used to link to this page
Your browser does not support the video tag.