My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16182 Gothard Street, Unit I <br />Huntington Beach, CA 92647 <br />Tel: 714-847-5957 / Fax: 714-847-5958 <br />16182 Gothard #I Huntington Beach Ca. 92647 / Office 714-847-5957, Fax 714-847-5958 <br />Pumping Station Specialists <br />CA Lic# 665995 <br /> INT.____________ <br />o QTY (1) Dedicated 120/240VAC 10KVA Power Zone for All Shelter Low Voltage Power <br />Requirements Including Extra Breakers for Customer Use <br />Station Piping <br />•Carbon Steel Station Piping <br />o Custom Formulated, Electrostatically Adhering, Thermally Cross-Linking, Fusion Bonded Epoxy <br />Coating <br />NSF 61 Certified, Drinking Water Safe, Fusion Bonded Epoxy Coating <br />Extreme Resistance to Corrosive Water and Harsh Chemicals <br />o All Piping Above 2IN Shall Be Both Internally and Externally Coated <br />•Piping Below 2IN shall be 304SS <br />•Hose Bibb Connection for Handy, Pressurized Water Access <br />•Corrosion and Wear Resistant Zinc Hardware <br />•16IN System Bypass Including Globe Style Check Valve <br />Transition Pipe <br />•QTY (1) 18IN Flanged X 18IN Flanged Inlet Transition Pipe with 90-Degree Elbows <br />o Piping to Stop Above Skid to Terminate with Customer Piping Extending Through the Floor <br />•QTY (1) 16IN Flanged X 18IN Flanged Discharge Transition Pipe with 90-Degree Elbows <br />o Piping to Stop Above Skid to Terminate with Customer Piping Extending Through the Floor <br />Testing <br />•Pump Station Shall be Hydrostatically Tested to the Design Pressure Prior to Shipment <br />•A Flow Test can be Performed Onsite at MCI’s Facility but Only Up to a Max of 2000GPM as Limited by the <br />Size of MCI’s Testing Equipment <br />•MCI to Test One Pump at a Time. <br />•For Any Flow Testing Done on Site at MCI a TESCO Representative with the Ability to Operate the Control <br />Panel Must be Present to Help with Testing <br />•MCI shall provide Power Connections to Provide Enough Power to Operate the PLC Platform and One <br />Pump for Testing of the System <br />•TESCO will provide pump station control via PLC and HMI in a panel to be wall mounted. <br />Page 191 of 658
The URL can be used to link to this page
Your browser does not support the video tag.