Page 6 of 15 <br /> <br />Table 4 – Water CIP Projects <br /> <br /> <br />In FY 2023/24, the City initiated urgent near-term water system improvements to support City <br />Council direction to shutdown its wells due to a detectable level of PFAS and to procure water <br />directly from Zone 7. In June 2024, the City secured a $19.0 million water revenue bond to <br />fund three major water line projects on Bernal Avenue, Stoneridge Drive, and Sunol <br />Boulevard. Remaining funding of $9.1 million needs to be carried forward to continue these <br />projects. <br /> <br />The Annual Water Distribution System Improvements project also completed critical updates, <br />installing seismic piping at key culvert crossings within Hacienda business park and <br />addressing a leak at the Kilkare Canyon bridge crossing. Temporary repairs were made to <br />Turnout #1, and a rental booster pump was installed at Turnout #4 to maintain adequate water <br />supply during summer months. <br /> <br />The Water System Management Plan (WSMP) is completed and will provide a comprehensive <br />guide for water supply management, quality standards, distribution capacity, and infrastructure <br />upgrades; thew final plan is being presented for City Council acceptance in November 2024. <br />Additionally, planned water system improvements will be incorporated into the West Las <br />Positas Multimodal Reconstruction project which is currently in design. <br /> <br />Parks CIP Projects <br />Page 263 of 658