My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 of 15 <br /> <br /> <br />In FY 2023/24, several facility improvements progressed despite challenges: <br />1. Library Lighting Upgrades: Design and construction began to replace all library lighting <br />with energy-efficient LED fixtures and a new control system. <br />2. Ken Mercer Sports Park Electrical: Replacement of failed electrical equipment is <br />underway; however, manufacturing delays mean temporary power poles are still in use. <br />3. St Mary Street Parking Lot: Safety improvements, including new fencing and lighting, <br />were completed. <br />4. Public Works Corporation Yard: A new emergency generator was installed, replacing <br />the rental unit. The design phase for replacing the outdated fire alarm system is also <br />being initiated. <br />5. Alviso Adobe Repairs: Funding for the bunkhouse and kitchen expansion was <br />reallocated to rebuild the main building's south wall. Additional repairs are needed to <br />address rodent damage. Historic preservation specialists will complete this work to <br />maintain the building's registered status. <br />6. Police Department Training Facility: While design is nearly complete, funding shortfalls <br />from development fees have postponed construction. <br />7. Century House Roof: The roof replacement was completed to prevent further building <br />Page 270 of 658
The URL can be used to link to this page
Your browser does not support the video tag.