Laserfiche WebLink
Jason Moody and Megan Gregory <br />September 24, 2024 <br />Page 4 of 8 <br />First, there has been an evaluation of whether there is an existing deficiency at any of the 18 new <br />project locations, and if so, the magnitude of that deficiency. Existing deficiencies are accounted <br />for by reducing the project cost that is included in the fee program. The concept of accounting for <br />existing deficiencies in a fee study is that new development should not be charged the full cost of <br />improving a facility if that facility is not meeting current operating standards during the critical <br />peak hour (typically the PM peak period). As in the original TIF study, the determination of <br />existing deficiencies is being drawn from the results of prior traffic analyses and the traffic count <br />data available from the City, and no new traffic data has been collected. Based on the available <br />information, no existing deficiencies were identified for the 19 new projects being added to the <br />TIF list. <br />Anticipated Direct Developer Contributions <br />Some of the projects listed in Attachment 1 are anticipated to be partially funded through direct <br />contributions from nearby developments, because those projects are needed to provide access to <br />the developments or as mitigation for the developments’ direct impacts. In those instances, the <br />percent eligibility for the TIF program has been set per direction from City staff. None of the 19 <br />new projects proposed to be added to the TIF program involve any direct developer <br />contributions. <br />Growth Projections <br />The City of Pleasanton’s Travel Demand Model was used to project future traffic volumes for the <br />Buildout Year scenario. The travel demand model includes forecasted land use changes and <br />roadway improvements, reflecting the growth anticipated in the Pleasanton General Plan. The <br />total amount of citywide growth in the major land use categories is presented below in Table 2. <br />Table 2: Growth Projections by Land Use Category <br />Land Use Unit Existing Buildout <br />Growth <br />(Existing - <br />Buildout) <br />% Growth <br />Residential Dwelling Units 30,992 37,781 6,788 22% <br />Non-Residential KSF 19,237 26,990 7,753 40% <br />Source: Fehr & Peers, 2024. <br />As part of this TIF study, Economic & Planning Systems (EPS) has prepared refined projections of <br />the number of residents and workers who would be associated with the new residential and non- <br />residential development summarized above. The EPS projections calculate that the “Service <br />Population” which is defined as all of the residential population and 40% of the employees, is <br />expected to grow from roughly 99,343 today to approximately 128,510 over the planning horizon <br />Page 120 of 893