Laserfiche WebLink
Jason Moody and Megan Gregory <br />September 24, 2024 <br />Page 5 of 8 <br />of this study. Thus, the Service Population added as a result of new growth will represent 22.7% of <br />the total future Service Population. <br />Costs Attributable to Pleasanton <br />The next step in the nexus analysis is to determine the proportion of project costs attributable to <br />the land uses within the City of Pleasanton. <br />Land use growth to the buildout year was incorporated into the Pleasanton travel demand model <br />and the model was applied to generate estimates of travel patterns and volumes in the future. A <br />common modeling technique called a select zone analysis was applied to identify the amount of <br />future traffic volume on each roadway link that would be generated by land uses in Pleasanton. <br />On each model link that represents the location of a project, the future traffic volume attributable <br />to Pleasanton was compared to the overall future traffic volume, thereby calculating the share of <br />the usage of that link that can be attributed to land uses in Pleasanton. These usage percentages <br />are shown in Attachment 1 in the column called Percent Pleasanton Trips, From Model. <br />Following the same approach that was used in the 2018 TIF nexus study, if more than 70% of the <br />usage of the facility was from Pleasanton, that indicates that the need for the improvement is <br />predominantly due to Pleasanton-related travel so the entire cost of the project was considered <br />to be included in the TIF program. This approach was used in recognition of the “lumpiness” of <br />most transportation infrastructure (for example, it is not possible to build half of a left-turn lane or <br />half of a traffic signal), and the consideration that if Pleasanton traffic was contributing more than <br />70% of the need for an improvement then it would be reasonable to conclude that the <br />improvement would not be needed but for the growth in Pleasanton. If less than 70% of the <br />usage was from Pleasanton, the percentage attributable to Pleasanton was used directly from the <br />model. The result is shown in Attachment 1 in the column called Percent Pleasanton Trips, <br />Adjusted. Note that these percentages have been newly calculated only for the 19 additional <br />projects proposed to be included in the TIF program. For all of the projects that are remaining <br />from the current TIF project list, the percentage of future traffic volume attributable to Pleasanton <br />has not been re-calculated but is carried forward from the 2018 TIF nexus study. <br />For projects that involve bicycle, pedestrian or safety enhancements, or those that are city-wide <br />projects, the percentage attributable to Pleasanton is calculated based on current data about <br />existing service population and projections of future growth. Per the growth projections described <br />above, that value is 22.7%. <br />Final Nexus Results <br />For each project, the cost to be included in the TIF program was calculated as the estimated <br />project cost multiplied by the eligibility factor (thus accounting for existing deficiencies and direct <br />developer contributions) and then multiplied by the Percent Pleasanton Trips, Adjusted. As shown <br />Page 121 of 893