Laserfiche WebLink
Low High Minimum Maximum <br />1 Bernal Avenue I-680 to East of Foothill <br />Construct a new bridge to the south of the <br />existing bridge to provide new bike lane and <br />two eastbound travel lanes. Existing bridge <br />will be converted to "westbound" direction <br />only. <br />$7,350,000 $7,350,000 No 100% 100%100% $7,350,000 $7,350,000 <br />2 Bernal Avenue I-680 to Valley Avenue <br />Widen to 6 lanes; at the intersection of Valley <br />Avenue, convert the westbound right turn <br />only lane into a through/right option lane; <br />convert the SBR only lane to a channelized <br />free right turn lane and convert the SB shared <br />through/right lane to an exclusive SBT lane <br />$1,470,000 $1,470,000 No 100% 96% 100% $1,470,000 $1,470,000 <br />3 Bernal Avenue Case Avenue/Old Bernal Avenue <br />Add southbound right turn lane on Old Bernal <br />Avenue $740,000 $740,000 No 100% 96% 100% $740,000 $740,000 <br />4 Busch Road East of Ironwood Drive to El Charro Road <br />Construct as 4 lane divided with Class I bike <br />facility along south side or Class IV bike <br />facilities <br />$12,340,000 $12,340,000 No 100% 100% 100% $12,340,000 $12,340,000 <br />5 El Charro Road Stoneridge Drive to Stanley Boulevard <br />Construct as 4 lane divided with Class I bike <br />facility along west side or Class IV bike <br />facilities <br />$78,670,000 $78,670,000 No 100% 99% 100% $78,670,000 $78,670,000 <br />6 First Street Vineyard Avenue/Ray Street <br />Convert east/west to protected/permissive left <br />turn phasing $110,000 $110,000 No 100% 97% 100% $110,000 $110,000 <br />7 First Street/Sunol Boulevard Bernal Avenue <br />Add 2nd WBL lane on Bernal and extend 2nd <br />SBT lane on First Street/Sunol Boulevard; <br />include bike lanes <br />$6,100,000 $6,100,000 No 100% 97% 100% $6,100,000 $6,100,000 <br />8 Foothill Road Stoneridge Drive <br />Add a third southbound left turn lane; <br />consider removing split phasing $590,000 $890,000 No 100% 90% 100% $590,000 $890,000 <br />9 Foothill Road Foothill High School <br />Widen SB approach to provide 2nd left-turn <br />lane and NB right turns $1,620,000 $1,620,000 No 100% 100% 100% $1,620,000 $1,620,000 <br />10 Hacienda Drive Owens Drive <br />Add 3rd southbound and eastbound left turn <br />lanes from through lanes $2,360,000 $2,360,000 No 100% 95%100% $2,360,000 $2,360,000 <br />11A Hopyard Road Owens Drive (Phase I) <br />Modify northbound lanes to full build <br />configuration: 2 left turns, 3 through, 1 right <br />turn <br />$0 $0 No 100% 86% 100% $0 $0 <br />11B Hopyard Road Owens Drive (Full Build) <br />Modify lanes; Northbound: 2 left turns, 3 <br />through, 1 right turn; Southbound: 3 left turns, <br />3 through, 1 right turn (free); Eastbound: 2 left <br />turn, 2 through, 1 right turn; Westbound: 2 <br />left turn, 2 through, 1 right turn (free); unsplit <br />eastbound/westbound; narrow lane to reduce <br />pedestrian clearance to 20 seconds <br />$2,500,000 $2,500,000 No 100% 86% 100% $2,500,000 $2,500,000 <br />12 Nevada Street First Street to California Avenue <br />Construct as 2 lane street with TWLTL and <br />bike lanes $7,350,000 $7,350,000 No 100% 100%100% $7,350,000 $7,350,000 <br />13 Santa Rita Road I-580 Eastbound Off-Ramp/Pimlico Construct 2nd southbound left turn lane $11,310,000 $11,310,000 No 100% 91% 100% $11,310,000 $11,310,000 <br />Attachment 1: 2024 Pleasanton TIF Update Project List <br /># <br />Estimated Cost ($2024)Cost Included in TIF Program <br />Roadway Improvements <br />Existing Deficiency?Percent Eligible for <br />Fee ProgramRoadway Explanation of <br />Eligibility <br />Percent Pleasanton <br />Trips, from Model <br />Percent Pleasanton <br />Trips, AdjustedImprovementsIntersection/Segment <br />1 <br />Page 125 of 893