Laserfiche WebLink
Low High Minimum Maximum <br /># <br />Estimated Cost ($2024)Cost Included in TIF Program <br />Existing Deficiency?Percent Eligible for <br />Fee ProgramRoadway Explanation of <br />Eligibility <br />Percent Pleasanton <br />Trips, from Model <br />Percent Pleasanton <br />Trips, AdjustedImprovementsIntersection/Segment <br />14 Santa Rita Road Valley Avenue <br />Construct second WB left-turn lane. Construct <br />3rd SB left-turn. Timing to be determined by <br />City Council under Program 2.3. <br />$2,940,000 $2,940,000 No 100% 100%100% $2,940,000 $2,940,000 <br />15 Stanley Boulevard Valley Avenue/Bernal Avenue <br />Extend sidewalk on east side of Valley Avenue <br />(from the termination near the train <br />overcrossing) to Stanley Boulevard and modify <br />intersection to provide crosswalk on the east <br />leg of the intersection and construct free <br />westbound right turn lane. <br />$3,680,000 $3,680,000 No 100% 99%100% $3,680,000 $3,680,000 <br />16 Stoneridge Drive I-680 Overpass Widen WB overpass by 1 to 2 lanes $11,760,000 $18,510,000 No 100% 90% 100% $11,760,000 $18,510,000 <br />17 Stoneridge Drive Hopyard Road <br />Provide EB free right turn (maybe remove one <br />SB through lane). Change cycle to 100 sec $1,140,000 $1,140,000 No 100% 97% 100% $1,140,000 $1,140,000 <br />18 Stoneridge Drive Springdale Avenue <br />Unsplit north/south phasing (safety <br />improvement)$110,000 $110,000 Yes 18% <br />Treated as existing <br />deficiency because <br />project is primarily <br />safety-focused. <br />88% 100% $19,800 $19,800 <br />19 Stoneridge Drive W Las Positas Boulevard <br />Convert a through lane for the northbound <br />and southbound approaches to a left turn <br />lane; restripe WB and EB lanes to add separate <br />WB and EB right turn lanes on Stoneridge <br />$80,000 $80,000 No 100% 100% 100% $80,000 $80,000 <br />20 Sunol Boulevard I-680 Interchange <br />Widen roadway in interchange area; signalize <br />both ramp intersections at Sunol Boulevard; <br />widen structure over Happy Valley Road and <br />provide a southbound acceleration lane from <br />Sunol On-Ramp <br />$31,000,000 $31,000,000 No 100% 97% 100% $31,000,000 $31,000,000 <br />21 W Las Positas Boulevard Hopyard Road Construct 3rd westbound left turn lane $1,210,000 $1,210,000 No 100% 98% 100% $1,210,000 $1,210,000 <br />22 Park and Ride Lot - Park and Ride lot at Bernal/I-680 $5,880,000 $5,880,000 No 100% 100% 100% $5,880,000 $5,880,000 <br />23 Embarcadero Court Embarcadero Court at two-way stop-controlled intersection Construct a roundabout $1,470,000 $1,470,000 No 100% 100% 100% $1,470,000 $1,470,000 <br />24 El Charro Road I-580 Interchange <br />I-580/El Charro Road Interchange <br />Improvements (Phase 2): reconstruction of <br />overcrossing to provide four-lanes in each <br />direction with bike lanes; reconstruction of the <br />southbound to eastbound loop on-ramp; <br />widening of the eastbound off-ramp to <br />provide two exit lanes with two left turn and <br />two right tum lanes; widening of the <br />eastbound on-ramp; widening of the <br />westbound off-ramp to provide two left tum <br />and two right tum lanes; and widening of the <br />westbound on-ramp <br />$46,120,000 $46,120,000 No 25% <br />City of Pleasanton is <br />only responsible for <br />25% of the project <br />cost <br />77% 100% $11,530,000 $11,530,000 <br />25 Hacienda Drive Hacienda Drive at I-580 Eastbound Off-Ramp <br />Modify signal and striping to convert #2 left <br />turn lane to a left/right option lane $60,000 $60,000 No 100% 84% 100% $60,000 $60,000 <br />26 Hopyard Road Hopyard Road at I-580 Eastbound Ramp <br />Modify signal to provide eastbound <br />right/northbound through overlap period $50,000 $50,000 No 100% 72% 100% $50,000 $50,000 <br />27 Hopyard Road Hopyard Road at I-580 Westbound Off-Ramp <br />Re-stripe off-ramp to convert #2 left turn lane <br />into a left/right option lane $30,000 $30,000 No 100% 56% 56% $16,800 $16,800 <br />28 Stoneridge Drive Stoneridge Drive at I-680 Northbound <br />Modify signal to allow a northbound <br />right/westbound through overlap period $50,000 $50,000 No 100% 96% 100% $50,000 $50,000 <br />29 Valley Avenue Valley Avenue at Koll Center Parkway North Un-split east/west signal phasing $60,000 $60,000 No 100% 100% 100% $60,000 $60,000 <br />2 <br />Page 126 of 893