Low High Minimum Maximum
<br />#
<br />Estimated Cost ($2024)Cost Included in TIF Program
<br />Existing Deficiency?Percent Eligible for
<br />Fee ProgramRoadway Explanation of
<br />Eligibility
<br />Percent Pleasanton
<br />Trips, from Model
<br />Percent Pleasanton
<br />Trips, AdjustedImprovementsIntersection/Segment
<br />14 Santa Rita Road Valley Avenue
<br />Construct second WB left-turn lane. Construct
<br />3rd SB left-turn. Timing to be determined by
<br />City Council under Program 2.3.
<br />$2,940,000 $2,940,000 No 100% 100%100% $2,940,000 $2,940,000
<br />15 Stanley Boulevard Valley Avenue/Bernal Avenue
<br />Extend sidewalk on east side of Valley Avenue
<br />(from the termination near the train
<br />overcrossing) to Stanley Boulevard and modify
<br />intersection to provide crosswalk on the east
<br />leg of the intersection and construct free
<br />westbound right turn lane.
<br />$3,680,000 $3,680,000 No 100% 99%100% $3,680,000 $3,680,000
<br />16 Stoneridge Drive I-680 Overpass Widen WB overpass by 1 to 2 lanes $11,760,000 $18,510,000 No 100% 90% 100% $11,760,000 $18,510,000
<br />17 Stoneridge Drive Hopyard Road
<br />Provide EB free right turn (maybe remove one
<br />SB through lane). Change cycle to 100 sec $1,140,000 $1,140,000 No 100% 97% 100% $1,140,000 $1,140,000
<br />18 Stoneridge Drive Springdale Avenue
<br />Unsplit north/south phasing (safety
<br />improvement)$110,000 $110,000 Yes 18%
<br />Treated as existing
<br />deficiency because
<br />project is primarily
<br />safety-focused.
<br />88% 100% $19,800 $19,800
<br />19 Stoneridge Drive W Las Positas Boulevard
<br />Convert a through lane for the northbound
<br />and southbound approaches to a left turn
<br />lane; restripe WB and EB lanes to add separate
<br />WB and EB right turn lanes on Stoneridge
<br />$80,000 $80,000 No 100% 100% 100% $80,000 $80,000
<br />20 Sunol Boulevard I-680 Interchange
<br />Widen roadway in interchange area; signalize
<br />both ramp intersections at Sunol Boulevard;
<br />widen structure over Happy Valley Road and
<br />provide a southbound acceleration lane from
<br />Sunol On-Ramp
<br />$31,000,000 $31,000,000 No 100% 97% 100% $31,000,000 $31,000,000
<br />21 W Las Positas Boulevard Hopyard Road Construct 3rd westbound left turn lane $1,210,000 $1,210,000 No 100% 98% 100% $1,210,000 $1,210,000
<br />22 Park and Ride Lot - Park and Ride lot at Bernal/I-680 $5,880,000 $5,880,000 No 100% 100% 100% $5,880,000 $5,880,000
<br />23 Embarcadero Court Embarcadero Court at two-way stop-controlled intersection Construct a roundabout $1,470,000 $1,470,000 No 100% 100% 100% $1,470,000 $1,470,000
<br />24 El Charro Road I-580 Interchange
<br />I-580/El Charro Road Interchange
<br />Improvements (Phase 2): reconstruction of
<br />overcrossing to provide four-lanes in each
<br />direction with bike lanes; reconstruction of the
<br />southbound to eastbound loop on-ramp;
<br />widening of the eastbound off-ramp to
<br />provide two exit lanes with two left turn and
<br />two right tum lanes; widening of the
<br />eastbound on-ramp; widening of the
<br />westbound off-ramp to provide two left tum
<br />and two right tum lanes; and widening of the
<br />westbound on-ramp
<br />$46,120,000 $46,120,000 No 25%
<br />City of Pleasanton is
<br />only responsible for
<br />25% of the project
<br />cost
<br />77% 100% $11,530,000 $11,530,000
<br />25 Hacienda Drive Hacienda Drive at I-580 Eastbound Off-Ramp
<br />Modify signal and striping to convert #2 left
<br />turn lane to a left/right option lane $60,000 $60,000 No 100% 84% 100% $60,000 $60,000
<br />26 Hopyard Road Hopyard Road at I-580 Eastbound Ramp
<br />Modify signal to provide eastbound
<br />right/northbound through overlap period $50,000 $50,000 No 100% 72% 100% $50,000 $50,000
<br />27 Hopyard Road Hopyard Road at I-580 Westbound Off-Ramp
<br />Re-stripe off-ramp to convert #2 left turn lane
<br />into a left/right option lane $30,000 $30,000 No 100% 56% 56% $16,800 $16,800
<br />28 Stoneridge Drive Stoneridge Drive at I-680 Northbound
<br />Modify signal to allow a northbound
<br />right/westbound through overlap period $50,000 $50,000 No 100% 96% 100% $50,000 $50,000
<br />29 Valley Avenue Valley Avenue at Koll Center Parkway North Un-split east/west signal phasing $60,000 $60,000 No 100% 100% 100% $60,000 $60,000
<br />2
<br />Page 126 of 893
|