My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
121724
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 11:39:08 AM
Creation date
12/11/2024 11:13:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/17/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />several strategies to reduce transportation emissions, including electrifying the municipal fleet <br />(Action P5). <br /> <br />The California Air Resources Board (CARB) Advanced Clean Cars II Regulations require all <br />new passenger cars, trucks, and SUVs sold in California to be zero-emissions vehicles (ZEVs) <br />by 2035. Further, CARB’s Advanced Clean Fleets Regulation requires that 50 percent of <br />municipal fleet vehicles purchased be ZEVs; this requirement increases to 100 percent in <br />2027. For Pleasanton to comply with the regulations and electrify the municipal fleet, the City <br />needs to install electric charging infrastructure. <br /> <br />The City’s adopted FY2023/24-2026/27 Capital Improvement Program (CIP) budget includes a <br />$2,000,000 line item for CAP implementation, specifically to install the necessary infrastructure <br />to electrify the City’s fleet. There is currently $1,000,000 budgeted in CIP No. 24461, and this <br />grant funding will augment the CIP budget to help meet the funding gap. <br /> <br />Staff is recommending City Council approval to allocate the U.S. Department of Energy funds <br />to the existing CIP for CAP implementation (Attachment 1). Specifically, the funds will be used <br />to install electric vehicle charging stations at five different locations at the City's Operations <br />Services Center at 3333 Busch Road, to be used by multiple City divisions. The installation <br />includes adding and updating electrical subpanels, conduits, breakers, wiring, and charging <br />station mounting. With City Council approval to accept the funding, the project will proceed in <br />2025. <br /> <br />Once the charging infrastructure is installed, as older vehicles are replaced and new vehicles <br />are purchased or leased, the City will be enabled to transition to ZEVs as required by CARB. <br />To fully equip facilities with chargers sufficient to transition the City’s fleet, additional chargers <br />will need to be installed in the future; however, the EECBG funds are expected to fully fund the <br />above-mentioned scope without the need to utilize the General Fund CIP budget at this time. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this item advances the City’s CAP 2.0 and aligns with Action P5 tp electrify the <br />municipal fleet as it will enable the City to purchase ZEVs which will reduce the City’s <br />emissions footprint and improve air quality. <br /> <br />OUTREACH <br />No outreach was conducted specifically for this grant, as this item is a routine matter of City <br />business. However, ample outreach was conducted during the CAP 2.0 process which <br />included the electrification of the municipal fleet over the coming several years. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic goals of Investing in Our <br />Environment, Strategy 6—Continue to Implement priority items from the Climate Action Plan <br />2.0 to lead by example in environmental sustainability, and Strategy 1—Implement the four- <br />year Capital Improvement Program (CIP) to complete the design and construction of budgeted <br />capital projects. <br /> <br />FISCAL IMPACT <br />The City’s EECBG voucher total was approved for $140,450 which will bolster the City’s <br />Page 233 of 893
The URL can be used to link to this page
Your browser does not support the video tag.