My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
121724
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 11:39:08 AM
Creation date
12/11/2024 11:13:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/17/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 9 <br />Table 2: Maximum Capital Facilities and Transportation Fee (Combined), Per Square <br />Foot <br />Unit Type Fee per Square Foot <br />$20.10 per square foot (Units 824-4,500 <br />square feet) <br />Minimum Fee (Units 824 square feet or <br />less: $16,567 <br />Single-Family (including Detached and <br />Townhome Units) <br />Maximum Fee: Units 4,500 square feet or <br />more: $90,437 <br />$35.95 per square foot <br />Minimum Fee (Units 417 sq.ft or less): <br />$14,982 per unit <br />Multi-Family <br />Maximum Fee (Units 1,600 square feet or <br />more): $57,517 per unit <br /> <br />Water and Wastewater Connection Fees <br />Raftelis has prepared the Draft Water and Wastewater Connection Fee Study, which includes <br />the necessary background, analysis and documentation to support the adoption of updated <br />connection fees (Attachment 1, Exhibit B). Tables 3 and 4 indicate the maximum justifiable <br />connection fee amounts for water and wastewater, respectively. <br /> <br />Table 3: Water Connection Fees (See Attachment 1, Exhibit B, Tables 8 and 9 for full list <br />of water connection fees) <br />Meter Size Meter <br />Capacity <br />2024 Update <br />Maximum Allowable <br />5/8" 25 $2,721.29 <br />3/4" 35 $3,809.81 <br />1" 55 $5,986.84 <br />1.5" 120 $13,062.20 <br /> <br />Table 4: Wastewater Connection Fees by Equivalent Dwelling Unit (See Attachment 1, <br />Exhibit B, Table 10 for full list of wastewater connection fees, including non-residential <br />uses) <br /> <br />EDU <br />Ratio <br />Factor 2024 Update <br />Maximum <br />Allowable <br />Single Family <br />Residential (SFR) 1 unit $556.24 <br />Secondary Dwelling <br />Unit 0.004 <br />square <br />foot $2.22 <br />Townhome/Duplex 1 per unit $556.24 <br />Condominium 0.75 per unit $417.18 <br />Apartment/Mobile <br />Home 0.66 per unit $367.12 <br />Page 52 of 893
The URL can be used to link to this page
Your browser does not support the video tag.