Laserfiche WebLink
Pleasanton Comprehensive Fee Update and Nexus Study November 2024 <br />Economic & Planning Systems, Inc. (EPS) 24 <br /> Transportation DIF <br />This section describes the methodology and assumptions used to calculate the <br />transportation component of the Pleasanton Impact fee program, also known as the <br />Transportation Impact Fee or TIF. Transportation consultant Fehr & Peers (F&P) provided <br />research and technical analysis to support the analysis and assumptions used in this fee <br />calculation. The more detailed documentation of their assumptions, methodology, and <br />data sources is provided in Appendix B. <br />Capital Needs, Costs, and Allocation <br />F&P, in coordination with City staff, developed a list of capital improvement projects for <br />inclusion as part of the Transportation category of the citywide Development Impact Fee. <br />The projects reflect the goals and objectives identified by the Pleasanton General Plan <br />and City budget documents, with some project needs determined based on existing <br />service standards as described below. The capital project list has a particular emphasis on <br />improving traffic flow and reducing conflicts for vehicles, bicyclists, and pedestrians <br />through the application of new signalized intersections, upgraded signal infrastructure, <br />and various pedestrian/bicycle safety improvements such as new bike lanes and bridge <br />railing. <br />The Transportation analysis uses the same service population calculations as those used <br />for the capital facilities fees, therefore the fair share allocation to new development used <br />for transportation items is 23 percent. <br />Table 14 lists each project type, the number of projects, and the resulting costs <br />allocated to new development and included in the fee program. As shown, the total <br />transportation-related costs included in the fee program sum to $293 million. A more <br />detailed list of these items and their descriptions can be found in Appendix Table B-1. <br />Following the same approach that was used in the 2018 TIF nexus study, if more than 70 <br />percent of the usage of the facility was from Pleasanton, that indicates that the need for <br />the improvement is predominantly due to Pleasanton-related travel so the entire cost of <br />the project was considered to be included in the TIF program. If less than 70 percent of <br />the usage was from Pleasanton, the percentage attributable to Pleasanton was used <br />directly from the model. The result is shown in Appendix Table B-1 in the column called <br />Percent Pleasanton Trips, Adjusted. Note that these percentages have been newly <br />calculated only for the 18 additional transportation improvement projects proposed to be <br />included in the TIF program. For all the projects that are remaining from the current TIF <br />project list, the percentage of future traffic volume attributable to Pleasanton has not <br />been re-calculated but is carried forward from the 2018 TIF nexus study. <br />For projects that involve bicycle, pedestrian or safety enhancements, or those that are <br />citywide projects, the percentage attributable to Pleasanton is calculated based on <br />Page 85 of 893