My WebLink
|
Help
|
About
|
Sign Out
RES 2025008
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 12:04:18 PM
Creation date
3/4/2025 11:59:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The EDU calculations shown in Table VIII-1 reflect the average A.M ./P .M . peak-hour <br />vehicular trip generation of 1.0 trip per residential unit , or 1.0 EDU ; 400 trips , or <br />400 EDU 's for the elementary school ; and 13 .5 trips , or 13 .5 EDU's for the community <br />park. The average A.M./P .M . peak-hour calculation was used because it best reflects <br />actual roadway demand during the two periods of the day when roadway capacity is the <br />most utilized. For residential , the A .M. and P.M . peaks are both approximately 1.0 trip <br />with an average of 1.0. The proposed community park is planned to provide primarily <br />leisure activities , and, therefore, the traffic it generates at both the A.M . and P.M. peaks <br />is minimal (13.5 trips averaged). The elementary school is projected to generate <br />754 A .M. peak-hour trips but only 46 P .M . peak-hour trips . Therefore, the average , or <br />400 trips, best represents the school 's effect on street capacity and its cost participation . <br />In addition , the Ruby Hill Pre-annexation Agreement requires the developer (Signature <br />Properties) to participate in the cost of improving Vineyard Avenue within the entire <br />Vineyard Avenue Specific Plan Area . Ruby Hill 's cost share will be 40 percent of the <br />total Vineyard A venue realignment cost. <br />Phase 1 roadway improvements will involve the initiation of reimbursement payments to <br />the Vista Diablo and Ruby Hill developers for past improvements that they funded for <br />portions of Vineyard Avenue within the Plan Area. Reimbursement will continue to the <br />time of Specific Plan Area buildout. Phase 1 will also include construction of a sidewalk <br />(including a section of retaining wall) along the south side of Vineyard Avenue from the <br />western border of the Plan Area eastward to the beginning of the abandoned Vineyard <br />Avenue section of roadway at Lot 15 . <br />Phase 2 includes completion of the Vineyard Avenue realignment east of the "S "-Curve . <br />This is required to take place concurrently with the development of the elementary school <br />and prior to final subdivision map recordation for non-elementary school development <br />on any of the following lots: Lots 19-21 and 25-32. In addition, trail and landscape <br />improvements will be made to the existing Vineyard A venue alignment between the <br />northwest corner of Lot 8 and the eastern border of the Plan Area. <br />The owners of Lots 1 and 4 will be required to dedicate the land needed for a narrow <br />Vineyard Avenue street frontage right-of-way expansion on their properties as a condition <br />of subdivision map approval for their properties. This will be considered a <br />non-reimbursable dedication in accordance with City standard subdivision land dedication <br />policy . The future Vineyard Avenue realignment right-of-way within Lots 18, 19, <br />and 32 will be subject to full reimbursement of land cost in conjunction with the roadway <br />cost-sharing apportionment program. The future Vineyard Avenue realignment right-of- <br />way within Lots 21 and 33 is expected to be dedicated to the City by the owner in <br />exchange for a three-home density bonus. <br />A Vineyard Avenue realignment right-of-way payment will be due to any property owner <br />who is impacted by the right-of-way acquisition program and either has no intention to <br />develop or has no possibility to develop at the time . The right-of-way payment will be <br />104
The URL can be used to link to this page
Your browser does not support the video tag.