My WebLink
|
Help
|
About
|
Sign Out
RES 2025008
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 12:04:18 PM
Creation date
3/4/2025 11:59:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
due to such property owner at the time of right-of-way acquisition. However, if a <br />property owner in receipt of a right-of-way payment subdivides within 15 years of the <br />funding agreement, the right-of-way payment with interest shall be refunded to the <br />funding developers. <br />All Plan Area streets which provide direct access to new development are considered to <br />be local serving. The City encourages joint financing of jointly used local streets <br />(e.g., Clara Lane). When a project develops a local street which benefits adjoining <br />properties, a reimbursement agreement should be used based upon standard mechanisms <br />for determining joint use eligibility and repayment responsibilities. <br />4. Detention Basin Improvements <br />Shared detention basin and outfall structure costs for the Specific Plan Area are broken <br />out separately from the street improvements. These costs are limited to facilities located <br />within or adjoining the realigned Vineyard A venue, which include one or more detention <br />basins to be located adjacent to the roadway and at least four new outfall structures for <br />storm water discharge into the Arroyo del Valle. The components of shared public storm <br />drainage system improvements for the Plan Area are illustrated in Figure VI-4 (in the <br />Public Facilities Chapter), and Table VIII-8 contains the system cost allocations. <br />Detention basin EDU calculations are presented in Table VIII-1. EDU's are based upon <br />an average of 6,000 square feet of impervious surface per residential lot, or 1.0 EDU. <br />Toe elementary school calculation is based upon an estimate of 261,360 square feet of <br />impervious surface on 12 acres for a total of 43.6 EDU's, and the park calculation is <br />based on an estimate of 20,000 square feet on 20 acres for a total of 3.3 EDU's. <br />Detention basin and outfall structure improvements are planned to occur in a single phase <br />at the same time that Vineyard Avenue is realigned. <br />5. Utility Undereroundin2 <br />Standard utility undergrounding improvements include the undergrounding of the existing <br />12KV power lines along the Vineyard Avenue frontage of Lot 18. The phasing of this <br />is presented in Figure VIII-4, and the cost allocations are provided in Table VIII-9. The <br />undergrounding of on-site lines is to be undertaken by individual project developers and <br />is, therefore, not included in these estimates. <br />Utility undergrounding EDU calculations are presented in Table VIII-1. EDU's are <br />determined on the basis of acres per land use planned as follows: 119 acres of <br />residential land with 189 new homes (119 acres + 189 homes = 0.63 acre per home), <br />or 1.0 EDU per home; 12 acres of school site divided by 0.63 acre per home for a total <br />of 19.0 EDU's; and 20 acres of park site divided by 0.63 acre per home for a total of <br />31.7 EDU's. <br />105
The URL can be used to link to this page
Your browser does not support the video tag.