Laserfiche WebLink
Page 1 of 4 <br />Item #10 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />March 18, 2025 <br />Public Works - Engineering Division <br /> <br />TITLE: AWARD A CONSTRUCTION CONTRACT TO TELSTAR INSTRUMENTS IN THE <br />AMOUNT OF $478,873 FOR THE SEWER STATION S-14 ELECTRICAL <br />IMPROVEMENTS PROJECT, CIP NO. 24265, APPROVE A DESIGN <br />PROFESSIONAL SERVICES AGREEMENT WITH FRISCH ENGINEERING, INC. <br />FOR THE NOT-TO-EXCEED AMOUNT OF $95,165 AND AUTHORIZE THE <br />DIRECTOR OF PUBLIC WORKS OR THEIR DELEGATE TO APPROVE AND <br />EXECUTE CONTRACT CHANGE ORDERS FOR A PROJECT CONTINGENCY <br />AMOUNT NOT-TO-EXCEED $72,000 <br /> <br />SUMMARY <br />The Sewer Station S-14 Electrical Improvements project consists of replacing all the <br />underground electrical equipment damaged by the 2023 winter storms with new equipment <br />placed above grade and completing the associated computer programming, located on Alisal <br />Street near Alisal Court. The City applied for a FEMA (Federal Emergency Management <br />Agency) disaster relief grant; the application was accepted, and project details are under <br />review, which will partially reimburse project costs. The project was designed by Frish <br />Engineering, then competitively bid for construction. Staff recommends award of the <br />construction contract to the lowest responsible bidder, Telstar Instruments, in the amount of <br />$478,873, approval of a design professional services agreement with Frisch Engineering, Inc. <br />for the not-to-exceed amount of $95,165 and authorization for the Director of Public Works or <br />their delegate to approve and execute contract change orders for a project contingency <br />amount not-to-exceed $72,000. <br /> <br />RECOMMENDATION <br />1. Award a construction contract to Telstar Instruments in the amount of $478,873 for the <br />Sewer Station S-14 Electrical Improvements Project, CIP No. 24265, and approve a <br />design professional services agreement with Frisch Engineering, Inc. for the not-to- <br />exceed amount of $95,165. <br />2. Authorize the City Manager to enter into the construction contract with Telstar <br />Instruments and the design professional services agreement with Frish Engineering, <br />Inc. <br />3. Authorize the Director of Public Works, or authorized staff, to approve and execute <br />contract change orders for a project contingency amount not-to-exceed $72,000 <br />(approximately 15 percent of the contract). <br /> <br /> <br />BACKGROUND <br />Severe winter storms from December 2022 to March 2023 caused damage throughout <br />Pleasanton. These weather events resulted in risks to the health, safety, and welfare of people <br />and property due to flooding, downed trees, loss of power, and property damage. <br /> <br />Page 177 of 348