My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:51 PM
Creation date
3/12/2025 1:13:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11LS <br />Installation of All <br />Items required as per <br />Contract Drawings <br />and Specifications <br />500,000.00$ $500,000 $478,873.00 $478,873.00 $485,000.000 $485,000.00 $546,785.00 $546,785.00 $697,000.00 $697,000.00 <br />TOTAL: <br />Subcontractors <br />Electrical Reliability Services <br />(ERS) <br />Item No. <br />Total <br />Quantity <br />(Approximate) <br />Item Description Unit Price Total <br />$500,000.00 $697,000.00 <br />Fort Bragg Electric Inc. <br />Unit Price Total <br />$546,785.00 <br />Blocka Construction, Inc <br />Unit Price <br />Bid Summary <br />Bockmon & Woody Electric Engineer's Estimate <br />Total <br />$478,873.00 <br />Unit Price Total <br />$485,000.00 <br />Telstar Instruments <br />Unit Price Total <br />Sewer Station S-14 Electrical Improvements, CIP No. <br />24265 Bid Opening: 02/19/2025 <br />Unit of <br />Measure <br />GSW ConstructionAP Traffic Services, Inc. <br />Power Systems Testing <br />Company <br />ATTACHMENT 1 <br />Page 181 of 348
The URL can be used to link to this page
Your browser does not support the video tag.