Laserfiche WebLink
Page 6 of 12 <br />project now to remove residential uses from the APA; this change would reduce the number <br />and mix of units and require significant changes to the circulation plan and general site layout. <br /> <br />Unit Count and Proportion of Senior Housing <br />As noted, the applicant’s preferred plan includes 697 units, which results in a gross density of <br />10.75 units per acre. Table 2 compares this total proposed unit count with the applicant’s <br />second alternative shared on February 18, 2025, and the pending Builder’s Remedy project in <br />the county. Table 2 also compares the percentage of age-restricted units in the preferred plan <br />with the second alternative and the county application. <br /> <br />Table 2: Proposed Unit Comparison <br />Preferred Plan Alternative 2 County Proposal Unit Type <br />Units Percent Units Percent Units Percent <br />Not Age- <br />Restricted <br />590 85% 540 86% 0 0% <br />Age Restricted 107 15% 88 14% 445 100% <br />Total 697 628 445 <br /> <br />Staff requests City Council feedback on the total number of units in the applicant’s <br />preferred plan. For the purpose of initiating project review under the California <br />Environmental Quality Act (CEQA), staff recommends proceeding with a project <br />description reflecting the greatest density that the City may be willing to accept on the <br />site. Through the project and CEQA review process, the City will identify potential impacts <br />from this density and require mitigation measures and/or conditions of approval to eliminate or <br />reduce these impacts. If necessary, mitigation measures or the final project approvals may <br />include reducing the number of project units. <br /> <br />The City Council should note that the East Lakes project needs to include a sufficient number <br />of units to finance the infrastructure needed to support the project. If the project includes too <br />few units, financing needed infrastructure (including El Charro Road) becomes infeasible as <br />the per unit cost is too high. City staff is currently in the process of preparing cost estimates for <br />El Charro Road and other area-wide infrastructure improvements. This cost information will be <br />used to help prepare an East Pleasanton infrastructure financing plan to be considered by the <br />City Council as part of the East Lakes project review. Staff will also share additional analysis <br />on the East Lakes unit count needed to reasonably absorb infrastructure costs at future <br />meetings. <br /> <br />Finally, if the environmental and other reviews continue to support a larger project, staff notes <br />it would generate more units to be counted toward the RHNA, including a number in excess of <br />what was counted in the Alameda County 6th Cycle Housing Element: this would be to the <br />City’s advantage. <br /> <br />Staff also requests City Council feedback on the proportion of age-restricted units in <br />the applicant’s preferred plan. As shown in Table 2, in the applicant’s preferred plan, 85 <br />percent of the total proposed units would be available to all households (not age restricted) <br />Page 329 of 348