My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:51 PM
Creation date
3/12/2025 1:13:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 12 <br />and 15 percent would be age-restricted to seniors. The applicant’s preferred plan includes <br />considerably fewer age-restricted units than the County's entirely senior residential proposal. <br />At the February 18, 2025, meeting a City Council majority supported a mix of age-restricted <br />and non-age-restricted, housing, but did not indicate a preferred percentage of each. <br /> <br />With respect to total unit count, City Council members have previously raised concerns about <br />various project impacts, some of which directly pertain to the total unit count and percentage of <br />age-restricted units; these issues include traffic and school capacity. Other concerns raised <br />relate to development in general, including geotechnical suitability, and hazardous materials. <br /> <br />Traffic <br />Regarding traffic, the City’s consultant prepared a study to analyze the impacts of new traffic <br />generated by East Pleasanton development on key roads and intersections, and looking in <br />particular at the triggers for, and effects of, construction of an extension of El Charro Road. As <br />outlined in the Supplemental Memorandum distributed for the February 18 City Council <br />meeting, the Kiewit project would trigger the need for El Charro Road to avoid unacceptable <br />congestion at Santa Rita Road/Valley Avenue; future developments including Arroyo Lago, <br />East Lakes, and a project on the Amazon property would further contribute to this need. The <br />study concluded that, with buildout of all projects, a 4-lane El Charro Road from Stoneridge <br />Drive to Stanley Boulevard would be needed to fully address future traffic volumes and impacts <br />to the existing network. <br /> <br />The traffic study looked at the smaller County-proposed 445-unit Senior project in its <br />evaluation for the East Lakes site. It is acknowledged that increasing the number of units, and <br />increasing the proportion of non-senior units, would also increase overall traffic generation. <br />With the mix of uses in the preferred plan, the PM peak hour traffic would increase by around <br />45% (equivalent approximately 140 additional PM peak hour trips). While staff is working to <br />update the study to reflect the applicant’s preferred project, in the City Traffic Engineer’s <br />opinion the study’s findings are unlikely to change such that El Charro would still be a required <br />improvement. In its preferred -lane configuration, El Charro would have adequate capacity to <br />accommodate a larger increment of project traffic. Furthermore, as noted above, increasing the <br />number of units would help to support the funding of this costly improvement, by helping to <br />spread the costs across an increased unit count to create a more feasible cost-burden per unit. <br /> <br />School Capacity <br />Regarding schools, in an initial discussion with City staff, PUSD staff indicated that due to <br />declining enrollment, the District expects to have sufficient capacity for additional students <br />generated from the applicant’s preferred plan. However, residential development in East <br />Pleasanton could create challenges for elementary school boundaries due to projected future <br />enrollment at individual schools. Mohr Elementary would have the greatest capacity to absorb <br />students from new East Pleasanton development. Improved vehicle and bicycle/pedestrian <br />connections from East Pleasanton to Mohr Elementary would be necessary to provide <br />convenient school access while minimizing traffic impacts. Staff will continue to work with <br />PUSD to provide a thorough assessment of impacts to schools at all levels (elementary, <br />middle and high schools), which considers the projected impact of new students generated by <br />the project. <br /> <br />Geotechnical Suitability and Hazardous Materials <br />City Council members have also raised concerns about geotechnical and hazardous materials <br />Page 330 of 348
The URL can be used to link to this page
Your browser does not support the video tag.