Laserfiche WebLink
Page 7 of 9 <br /> <br />West Las Positas <br />The City of Pleasanton identified the repair and replacement of West Las Positas as a priority <br />infrastructure project along with prioritizing it as a major on-street bicycle route in the Bicycle <br />and Pedestrian Master Plan. On December 6, 2022, the City Council approved a design <br />agreement with Mark Thomas to prepare two design alternatives: Alternative 1 being a “quick <br />build” concept identifying the necessary work within the existing roadway with limited changes <br />to the existing infrastructure, and Alternative 2, an “ultimate build” concept identifying work to <br />build a multimodal trail permanently. Based on the conceptual plan, it is estimated that the <br />project's construction cost, including construction services for Alternative 1 and 2, is $14.5 <br />million and $38.5 million, respectively. <br /> <br />Project status: The design of the street project is underway. <br />• On August 6, 2024, the city held a kick-off meeting with the consultant, Mark Thomas, <br />to begin working on the design of the construction documents. <br />• On November 4, staff received 65% of the complete construction documents from the <br />consultant. On January 9, 2025, city staff reviewed staff comments for the 65% <br />submittal with the consultant. <br /> <br />Augustin Bernal Park Fuel Reduction <br />The threat of the recent Canyon Fire on Pleasanton Ridge, which burned 71 acres in June <br />2022, prompted an internal discussion between the Livermore-Pleasanton Fire Department <br />(LPFD) and city staff regarding fire management and future fire protection along the City’s <br />Page 46 of 48