Laserfiche WebLink
13 <br /> <br />construction and operation. A revised EIR should be prepared that incorporates all feasible mitigation <br />measures and includes an updated GHG analysis to ensure the implementation of these measures and <br />maximize emissions reductions. <br />Disclaimer <br />SWAPE has received limited discovery regarding this project. Additional information may become <br />available in the future; thus, we retain the right to revise or amend this report when additional <br />information becomes available. Our professional services have been performed using that degree of <br />care and skill ordinarily exercised, under similar circumstances, by reputable environmental consultants <br />practicing in this or similar localities at the time of service. No other warranty, expressed or implied, is <br />made as to the scope of work, work methodologies and protocols, site conditions, analytical testing <br />results, and findings presented. This report reflects efforts which were limited to information that was <br />reasonably accessible at the time of the work, and may contain informational gaps, inconsistencies, or <br />otherwise be incomplete due to the unavailability or uncertainty of information obtained or provided by <br />third parties. <br /> <br />Sincerely, <br /> <br /> <br />Paul E. Rosenfeld, Ph.D.