My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:58:22 AM
Creation date
3/18/2025 2:49:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
749
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 18 <br />understand a potential cost-sharing framework, the analysis divided this cost based on flows <br />needed to supply water for each project; a pro-rata share contribution from each project was <br />calculated to assist owners in understanding the expected financial burden. The analysis <br />assumes the City would not contribute funding, since the pipeline would be installed for the <br />benefit of the new private development in East Pleasanton, rather than correcting an existing <br />deficiency or serving other properties outside the study area. Phasing of the pipeline was also <br />considered since it is assumed not all projects will be constructed at once. Whether phased or <br />constructed in full, a complete pipeline is ultimately needed for operational redundancy and <br />water quality. Cooperation between owners would be needed to construct the pipeline. <br /> <br />Wastewater: <br />Woodard & Curran prepared a Draft Sewer Impact Study that analyzes capacity in the City’s <br />sanitary sewer collection network between the East Pleasanton annexation area and the <br />Dublin San Ramon Services District treatment plant. The study identified three significant <br />sewer network deficiencies that would require correction before the proposed projects could <br />connect. From upstream to downstream the deficiencies include (1) undersized pipes on <br />Kamp Drive and Begonia Court, south of Mohr Avenue; (2) undersized pipes on Palmer Drive, <br />Cameron Avenue, Kamp Drive, and Stoneridge Drive north of Mohr Avenue; and (3) an <br />undersized sewer siphon under Arroyo Mocho creek at Santa Rita Road. <br /> <br />Approximately 5,300 lineal feet of pipe requires upsizing within existing neighborhoods; the <br />cost is currently being studied. Similar to the water analysis, a potential cost-sharing <br />framework will be developed that divides the total cost based on flow contributions from each <br />project. Phasing opportunities are limited since all scenarios require the upsizing of existing <br />pipes. The study assumed no funding contribution from the City since all network deficiencies <br />are caused by the new development. Cooperation between owners would be needed to <br />address these network deficiencies in a coordinated and comprehensive way. The developer <br />of the Kiewit property at 3300 Busch Road has already agreed to fund their estimated share of <br />network upgrades. <br /> <br />Storm Drain <br />The projects rely on stormwater discharge to Cope Lake, one of the chain-of-lakes operated <br />by Zone 7 Water Agency. The applicants claim to have historic drainage rights for this <br />discharge. State of California regulations require stormwater to be treated to remove <br />pollutants before discharge. In Zone 7’s comment letter to Alameda County for the Arroyo <br />Lago DEIR, the manner of treatment was questioned. In addition to common pollutants, Zone <br />7 expressed concern over PFAS discharge into Cope Lake which it operates for groundwater <br />basin recharge; it is assumed Zone 7 will continue to question this issue whether the projects <br />are built under County jurisdiction or in the city after annexation. The City operates a pipe <br />network on Busch Road for storm drainage, although no analysis has yet been conducted to <br />evaluate capacity or feasibility for connection. <br /> <br />Traffic/Roadway Improvements <br />Staff expects that circulation and roadway improvements needed to serve the Arroyo Lago <br />and East Lakes projects, as well as other projected traffic growth in Pleasanton, will include: <br />• Busch Road: Two-lane roadway with roundabouts or four-plus lanes at intersection. <br />The Arroyo Lago and East Pleasanton projects will reserve additional right-of-way to <br />accommodate a four-lane roadway, which is projected to be needed in the long term, <br />Page 206 of 749
The URL can be used to link to this page
Your browser does not support the video tag.