My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:58:22 AM
Creation date
3/18/2025 2:49:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
749
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 18 <br />per the City’s traffic model. <br />• Iron Horse Trail: A new east-west trail along the south side of Busch Road, and north- <br />south trail at El Charro Road connecting to the Iron Horse Trail and Arroyo Mocho <br />Trail. <br />• Santa Rita Road at Valley Avenue: Third southbound left turn lane and second <br />westbound left turn lane. <br />• El Charro Road: Four-lane roadway from Stoneridge Drive to Stanley Boulevard. <br /> <br />To address the timing for construction of El Charro Road, the City requested Fehr and Peers <br />complete an evaluation of the proposed developments in East Pleasanton and their effects on <br />the circulation network using the City’s traffic model. The study’s purpose was to determine <br />when El Charro Road will be necessary; that is, what increment of new traffic generated by <br />East Pleasanton projects would cause the Valley Avenue/Santa Rita Road intersection to fall <br />below LOS D. <br /> <br />The traffic study indicates that the Santa Rita corridor will be at capacity with the construction <br />of the Kiewit project. The intersection of Santa Rita Road and Valley Avenue, even after it is <br />modified to include a third southbound left turn lane and a second westbound left turn lane, is <br />LOS D falling to LOS E with the Kiewit project traffic. The addition of new trips with the Arroyo <br />Lago and/or East Lakes projects further necessitates the construction of El Charro Road. <br /> <br />As described above, a significant concern with the construction of El Charro Road is whether it <br />would induce new cut-through traffic. Figures 1 and 2 show the existing AM and PM cut- <br />through traffic patterns between I-580 and I-680, including the existing concentration of cut- <br />through traffic on Santa Rita Road, particularly in the morning peak time. Although the final <br />results of the analysis are still being refined, the City's traffic engineer expects the construction <br />of El Charro Road will have a neutral effect in terms of cut-through volume (i.e., the same <br />number of cut-through trips will occur). However, the cut-through traffic will migrate from the <br />congested corridor along Santa Rita Road, in favor of the new El Charro Road; this reduction <br />of cut-through volumes on Santa Rita Road allows for greater mobility within the city. <br /> <br />Finally, with respect to El Charro Road, there has been discussion of whether El Charro is <br />needed as a 4 lane roadway or if 2 lanes are sufficient. Additionally there has been discussion <br />on where the extension would terminate, whether at Busch Road, or continuing further south <br />to connect to Stanley Boulevard. This item will be further analyzed in the forthcoming traffic <br />study, but based on previous analyses, and preliminary data from the current study shows <br />minor improvements with a 2 lane El Charro but the Santa Rita corridor continues to fail. <br />Similarly, not connecting El Charro Road to Stanley Boulevard would reduce the beneficial <br />effects of the extension in alleviating congestion along the Santa Rita Road and Valley <br />Avenue corridors. Construction of this southern segment will be more complex and costly, <br />since the road needs to be designed with an undercrossing of the UPRR line. At the most <br />direct connection point, there is limited distance between Stanley Boulevard and the railroad <br />line, so the alignment and geometry of the intersection will need to be adjusted to ensure it is <br />feasible. <br /> <br />Page 207 of 749
The URL can be used to link to this page
Your browser does not support the video tag.