My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
03-26
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:59:53 PM
Creation date
3/21/2025 1:58:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tract 8724, 0 Vineyard Avenue Planning Commission <br />Page 8 of 11 <br /> <br /> <br /> <br />measures, and such plan shall be approved by the Director of Community Development <br />or designee. Air quality construction measures shall include (1) Basic Construction <br />Mitigation Measures, as approved by the Bay Area Air Quality Management District <br />(BAAQMD) in 2017, or the then currently adopted guidelines, and, (2) where <br />construction-related emissions would exceed the applicable thresholds as demonstrated <br />by a qualified consultant conducted pursuant to methodologies considered acceptable <br />at that time, Additional Construction Mitigation Measures, as recommended by the <br />BAAQMD, shall be implemented to reduce emissions to acceptable levels. The air <br />quality construction plan shall be included on all grading, utility, building, landscaping, <br />and improvement plans during all phases of construction and for access roads, parking <br />areas, and staging areas at construction sites. <br />• MM AIR-1b: The following measures pertain to project sites where residences would be <br />located within distances where the Bay Area Air Quality Management District <br />(BAAQMD) or the California Air Resources Board (ARB) recommends not siting <br />residential uses due to exposures to Toxic Air Contaminants. For example, the current <br />2005 ARB Land Use Book recommends that agencies avoid siting new sensitive land <br />uses within 500 feet of a freeway, urban roads within 100,000 vehicles/day, or rural <br />roads with 50,000 vehicles/day. Indoor Air Quality–In accordance with the <br />recommendations of the BAAQMD, appropriate measures (refer to Section 5 of the <br />BAAQMD CEQA Guidelines) shall be incorporated into building design in order to <br />reduce the potential health risk due to exposure of sensitive receptors to TACs, <br />including, but not limited to: <br />o locate sensitive receptors as far as possible within each project site from any <br />freeways, major roadways or other non-permitted TAC sources (e.g., loading <br />docks, parking lots); <br />o incorporate tiered plantings of trees (such as redwood, deodar cedar, live oak, <br />and/or oleander) to the maximum extent feasible between the sources of <br />pollution and sensitive receptors; <br />o install, operate and maintain in good working order a central heating ventilation <br />and air conditioning (HVAC) system or other air take system in the building, or in <br />each residential unit, that meets or exceeds an efficiency standard of MERV 13, <br />including the following features: installation of high efficiency filter and /or carbon <br />filter to filter particulates and other chemical matter from the building (either <br />HEPA filters or ASHRAE 85 percent supply filters); <br />o retain a qualified HVAC consultant or Home Energy Rating System (HERS) rater <br />during the design phase of the project to locate air ventilation and the HVAC <br />system intakes based on exposure modeling from pollutant sources; <br />o install indoor air quality monitoring in buildings; and <br />o applicants shall ensure that HVAC systems and air ventilation systems are <br />maintained, repaired, or replaced on an ongoing and as -needed basis. If the <br />project includes for-sale units, then the applicant shall prepare two operation and <br />maintenance manuals for the HVAC systems and the filters: one manual shall be <br />included in the recorded Conditions Covenants and Restrictions (CC&Rs) that <br />shall be recorded, and the manual shall be distributed to building maintenance <br />staff; the other manual shall be written for homeowners with operating
The URL can be used to link to this page
Your browser does not support the video tag.