My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
03-26
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:59:53 PM
Creation date
3/21/2025 1:58:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P24-0596, 0 Vineyard Avenue Zoning Administrator <br />8 of 14 <br />Zoning and Specific Plan Conformance <br />The subject site is zoned Planned Unit Development – Elementary School (PUD-Elementary <br />School), with a Housing Opportunity Zone (HOZ) overlay, which references the Housing <br />Element as to allowable density for this and other Housing Element sites. The site is also <br />within the VACSP area. The specific plan designation for the site is Elementary School. In <br />addition to the uses permitted pursuant to the Vineyard Avenue Corridor Specific Plan, housing <br />is also allowed as a permitted use pursuant to the 6th Cycle Housing Element. The project is <br />consistent with the zoning and VACSP, since it proposes residential uses, in conformance with <br />the Housing Element’s allowable density for the site. <br /> <br />Grading and Drainage <br />The subject site is relatively level, sloping down on the southwest corner of the site. The <br />applicant is proposing to cut approximately 19,668 cubic acres and fill approximately 19, 668 <br />cubic acres on site. The applicant proposes to create 3 foot retaining walls between lots 2 <br />through 9, 12 through 18, 20 through 21 and an approximately 5 foot retaining wall between <br />lots 26 and 27. Site drainage will be directed towards landscaped bio-retention planters located <br />in the park/open space area at the north of the site retention and treatment before draining into <br />the City’s storm drain system. As conditioned, staff finds the proposed grading and drainage <br />plan to be acceptable and in compliance with applicable grading and stormwater runoff <br />requirements. <br /> <br />Climate Action Plan 2.0 <br />In 2022, the City adopted Climate Action Plan (CAP) 2.0. The CAP 2.0 was reviewed by the <br />Bay Area Quality Management District (BAAQMD) and was deemed a “Qualified Greenhouse <br />Gas Reduction Strategy” in accordance with the District’s CEQA guidelines. Implementation of <br />the CAP will occur over several years. The CAP consists of amendments to regulations and <br />policies related to Land Use and Transportation, Energy, Solid Waste, and Water and <br />Wastewater, which result in reductions in greenhouse gas emissions in compliance with the <br />targets set by AB 32, California’s Global Warming Solutions Act of 2006. <br /> <br />Staff completed an analysis of how the proposed project is consistent with or implements the <br />applicable measures outlined in the City of Pleasanton’s CAP. The project will provide EV <br />ready parking spaces. In addition, several Strategies and Supporting Actions related to water <br />and energy conservation from the CAP are implemented in the proposed project, including that <br />the proposed homes would be all electric and not contain any new gas facilities. <br /> <br />Traffic <br />Several residents have expressed concerns about traffic safety along Vineyard Avenue, <br />particularly at the intersections of Thiessen Street and Manoir Lane. A traffic analysis <br />conducted for the project determined that the addition of 27 new homes, and traffic conditions <br />along Vineyard Avenue do not meet the criteria for a traffic signal at either location, since the <br />signal warrants were not met (see Appendix H in Exhibit C). Since the criteria are not met, the <br />City cannot require the project install a traffic signal. <br /> <br />However, as part of the project, and shown in Figure 4, Vineyard Avenue will be re-striped in <br />accordance with the Pleasanton Pedestrian and Bicycle Master Plan. These improvements will <br />include narrower travel lanes, buffered bike lanes, and shared bike-and-right-turn pockets with <br />green pavement markings in advance of Thiessen Street and Manoir Lane. These <br />enhancements aim to improve accessibility for all road users.
The URL can be used to link to this page
Your browser does not support the video tag.