Laserfiche WebLink
P24-0596, 0 Vineyard Avenue Zoning Administrator <br />9 of 14 <br /> <br />Figure 4: Striping Detail <br /> <br /> Public Safety <br />At hearings for the General Plan Amendments and Vineyard Avenue Corridor Specific Plan <br />Amendments related to this project, members of the public raised concerns about public safety <br />at the lot and on the trail. Neighbors noted that the loop road and cul-de-sacs are often used to <br />park vehicles associated with unwelcome behaviors. The design of the project implements two <br />key aspects of crime prevention through environmental design principles (CPTED): natural <br />surveillance and natural access control. By building homes on this vacant parcel there will be <br />more “eyes on the street,” which increases perceived risk to offenders. Additionally, in response <br />to neighbor concern, the applicant is installing bollards on the south end of the loop road, so that <br />people may not drive their vehicles behind the project site. <br /> <br />OBJECTIVE DESIGN STANDARDS FINDINGS AND ANALYSIS <br />The Zoning Administrator considers and renders a decision regarding whether a project <br />reviewed under the Objective Design Standards with up to 50 residential units complies with <br />applicable objective design standards and related environmental mitigation measures. <br /> <br />Project approval shall be granted when the Zoning Administrator finds that the following <br />findings are met: <br /> <br />1. The project complies with the requirements of the objective design standards and <br />any other applicable objective standard established with adopted City plans and <br />documents; <br /> <br />The purpose of the Objective Design Standards is to ensure projects will be compatible <br />with their surroundings, attractively designed and landscaped, and minimize impact to <br />aesthetic resources. As detailed in this report, the project complies with the Objective <br />Design Standards, the Climate Action plan, and objective standards in the PMC. <br /> <br />2. The project complies with mitigation measures of any applicable environmental <br />document; <br /> <br />Section 21081.6 of the California Environmental Quality Act (CEQA) and CEQA <br />Guidelines Section 15097 require a Lead Agency to adopt a Mitigation Monitoring and <br />Reporting Program (MMRP) whenever it certifies an Environmental Impact Report in <br />conjunction with a project approval. The purpose of the MMRP is to ensure compliance <br />with the mitigation measures occurs during project implementation. <br />