Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Project Description <br /> <br /> <br /> 9 <br />accessible entrances at the front of the proposed project, at least one <br />bathroom, and at least one bedroom in each unit. <br />The exterior surfaces of the proposed buildings would employ materials such <br />as cementitious panel, cementitious board and batten, cementitious lap <br />sliding, vinyl windows, and stone veneer. Exhibit 6a through 6d show <br />elevations of proposed building styles. <br />Villages 1 through 3 would include 6-foot fences around each unit. A 6- to 8- <br />foot-high precast wall would surround the entirety of the project site. <br />2.4.3 - Landscaping <br />Landscaping would be included throughout the project site, with an <br />emphasis on surrounding pedestrian circulation areas. Landscaping and <br />related irrigation would be required to comply with applicable provisions of <br />the City’s Water Efficient Landscaping Ordinance (WELO). Landscaping <br />would be designed for aesthetic appeal, to enhance and complement <br />building entrances and façades, and to facilitate circulation. <br />Landscaping along Busch Road, Valley Avenue, and the interior roads would <br />also include various street trees including, but not limited to, Tilia cordata, <br />Robinia “Purple Robe,” Fraxinus “Fan West,” Pistacia chinenesis, and other <br />comparable species that meet the City requirements (Exhibit 7). <br />2.4.4 - Access and Circulation <br />Vehicular Circulation <br />Vehicle access to the project site would be provided by new roadway <br />connections on Busch Road through (currently known as) Street D and Valley <br />Avenue through Boulder Street. Internal circulation would be provided via <br />various internal roadways throughout the project site (Exhibit 5). <br />Alternative Transit <br />The project site is located within approximately 1 mile of the closest bus stop <br />at Santa Rita and Valley Avenue and approximately 1.8 miles from the next <br />closest bus stop at Main Street and Vervais Avenue. <br />The project site is approximately 2.8 miles from the Pleasanton Station of the <br />Amtrak Thruway Connecting Service, servicing the Altamont Corridor Express <br />(ACE) rail line. The West Dublin/Pleasanton Bay Area Rapid Transit (BART) <br />Station is about 7.3 miles from the project site.