My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />90 <br />protected nesting birds, roosting bats, rare plants, sensitive <br />communities, protected waters and wetlands (analyze project- <br />specific compliance with Clean Water Act [CWA], Porter- <br />Cologne Water Quality Act, and Fish and Game Code, as <br />applicable), wildlife corridors and nursery sites. The BRA shall <br />develop and define prescriptive and site-specific measures <br />reducing potential impacts to a less than significant level. These <br />measures shall be included as Conditions of Approval for the <br />project and be incorporated into building and grading permits <br />issued for demolition and construction. If a water feature is found <br />to be jurisdictional or potentially jurisdictional, the applicant shall <br />comply with the appropriate permitting process with each <br />agency claiming jurisdiction prior to disturbance of the water <br />feature. <br />The project applicant or sponsor shall ensure that, if <br />development of habitat occupied by special-status species, <br />migratory or nesting birds must occur as determined by a <br />qualified Biologist and/or Wetland Regulatory Specialist, species <br />impacts shall be avoided or minimized, and, if required by a <br />regulatory agency or the CEQA process, loss of wildlife habitat or <br />individual plants shall be fully compensated on a site. If on-site <br />mitigation is not feasible in the City’s or regulatory agency’s <br />discretion, it shall occur within the City of Pleasanton Planning <br />Area whenever possible, with a priority given to existing habitat <br />mitigation banks. Habitat mitigation shall be accompanied by a <br />long-term management plan and monitoring program prepared <br />by a qualified Biologist and include provisions for protection of <br />mitigation lands in perpetuity through the establishment of <br />easements and adequate funding for maintenance and <br />monitoring; the time frame for the funding shall be detailed in <br />the long-term management plan and monitoring program <br />completed prior to disturbance of occupied habitat. <br />Mitigation Measures for the Proposed Project <br />Implement MM BIO-1. <br />Conditions of Approval <br />Housing Element Update FEIR MM BIO-1 has been partially satisfied via the <br />preparation of the project-specific analysis prepared by FCS and included
The URL can be used to link to this page
Your browser does not support the video tag.