Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 91 <br />herein. In accordance with the analysis, and to demonstrate full compliance <br />with MM BIO-1 and goals, policies, and programs included as part of the <br />General Plan, prior to the issuance of grading permits, the applicant shall <br />submit proof of completion of the following actions: <br />COA BIO-1 Protection of Active Bird Nests (includes pre-construction survey <br />and implementation of avoidance buffer, if found). <br />• Removal of trees shall be limited to the extent feasible to only <br />those reasonably necessary to construct the proposed project <br />as reflected in the relevant project approval documents. <br />• If the proposed project requires vegetation to be removed <br />during the nesting season (February 1 to August 31), pre- <br />construction surveys shall be conducted no more than 7 days <br />prior to the start of ground or vegetation disturbance <br />(including tree removal) in connection with the subject <br />individual development phase to determine whether or not <br />active nests are present. <br />• If an active nest is located during pre-construction surveys, a <br />qualified Biologist shall determine an appropriately sized <br />avoidance buffer based on the species and anticipated <br />disturbance level. (The California Department of Fish and <br />Wildlife [CDFW] recommends a minimum no-disturbance <br />buffer of 250 feet around active nests of non-listed bird species <br />and a 500-foot no-disturbance buffer around active nests of <br />non-listed raptors.) A qualified Biologist shall delineate the <br />avoidance buffer using Environmentally Sensitive Area fencing, <br />pin flags, and/or yellow caution tape. The buffer zone shall be <br />maintained around the active nest site(s) until the young have <br />fledged and are foraging independently, as confirmed by a <br />qualified Biologist. No construction activities or construction <br />foot traffic is allowed to occur within the avoidance buffer(s). <br />• In consultation with the United States Fish and Wildlife Service <br />(USFWS) or CDFW (as appropriate), the qualified Biologist shall <br />monitor the active nest during the subject construction <br />activities and modify the protection zone accordingly to <br />prevent project-related nest disturbance, until the young have <br />fledged. <br />