Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 93 <br />compatible is probably the single most effective measure that <br />can be taken to assure health of the trees. <br />Mulch should gradually recede in depth from four inches to zero <br />within three feet of the trunk, as to not place mulch directly <br />against tree trunks. Decorative mulch may be used instead of <br />the natural mulch, but is far less effective in maintaining tree <br />health, and is typically much more expensive. <br />COA BIO-4 Valley Oak No. 581 <br />The property owner shall discuss potential impacts to Valley Oak <br />Number (No.) 581 and other trees immediately south of the <br />property boundary with the Project Arborist. <br />To help assure safe retention of this tree, all grading and <br />construction work within the Critical Root Zone (CRZ) shall be <br />performed under Project Arborist supervision. Adhere to the <br />following guidelines to further reduce root loss within the CRZ and <br />overall impact to trees: <br />• Prior to grading in this area, an inspection trench shall be dug, <br />either by hand or Airspade 5 at the furthest extent of <br />excavation required for excavation and construction to <br />expose roots critical for health and overall tree stability. The <br />approximate locations of these trenches will be shown on the <br />site map in green on future addenda to this report and will be <br />finalized in-field by the Project Arborist. <br />• Any trenches that must remain open for over 24 hours during <br />the dry season from April to October shall be covered with <br />three layers of burlap and kept moist until trenches are <br />backfilled. <br />• The Project Arborist shall be on-site to document the size, <br />number, and location of roots impacted or removed from <br />these trees. <br />• Roots up to two inches in diameter may be severed cleanly <br />with a reciprocating saw just behind the face of soil. <br /> <br />5 An Airspade is a specialized excavation tool that uses high-pressure air to break up and remove soil with <br />minimal damage.