My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />104 <br />during project construction. In such a case, procedures for inadvertent <br />discovery under federal, State, and local laws would apply. <br />Environmental effects would be avoided by the imposition of uniformly <br />applied development policies or standards. Therefore, development of the <br />site as proposed would not result in any environmental effects that are <br />peculiar to the proposed project. The proposed project would not result in a <br />new or more severe adverse impact that was not previously identified in the <br />Housing Element Update FEIR. <br />Conclusion <br />With regard to Cultural and Tribal Cultural Resources, the Consistency <br />Checklist demonstrates that: <br />1. No peculiar impacts related to the proposed project or its site have <br />been identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. No mitigation measures would be required because the proposed <br />project’s specific impacts would be less than significant. <br /> <br />Mitigation Measures <br />None. <br />Applicable General Plan Policies <br />General Plan Program 5.1 When reviewing applications for development <br />projects, use information regarding known <br />archaeological finds in the Planning Area to <br />determine whether an archaeological study, <br />construction monitoring or other mitigations are <br />appropriate. Require that archaeological <br />studies meet the requirements of the CEQA <br />Guidelines Section 15064.5 in identifying <br />mitigation measures if an archaeological site is <br />encountered. Include provisions for the <br />interpretation of cultural resources. Consult with
The URL can be used to link to this page
Your browser does not support the video tag.