My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 123 <br />crew, project activities shall be diverted at least 15 feet from the <br />discovered paleontological resources until a professional <br />Paleontologist has assessed such discovered resources to <br />determine whether they are significant and significant resources <br />shall be salvaged in a timely manner. The <br />applicant/owner/sponsor of said project shall be responsible for <br />diverting project work and providing the assessment including <br />retaining a professional Paleontologist for such purpose. <br />Collected fossils shall be deposited by the <br />applicant/owner/sponsor in an appropriate repository where the <br />collection shall be properly curated and made available for <br />future research (e.g., University of California Museum of <br />Paleontology (UCMP), California Academy of Sciences). <br />Mitigation Measures for the Proposed Project <br />Implement MM GEO-6 <br />Applicable General Plan Policies <br />General Plan Program 2.2 Design and construct all structures to address <br />potential seismic and geologic hazard <br />conditions according to the California Building <br />Standards Code (CBC) standards or more <br />stringent standards. All structures and facilities <br />not addressed by the CBC shall be designed <br />and constructed to mitigate potential seismic <br />and geologic hazards as recommended by <br />site-specific soils, geologic, and/or <br />geotechnical engineering studies. <br />General Plan Program 2.2 has been partially satisfied by preparation of the <br />project-specific Geotechnical Report described above. In accordance with <br />the analysis, and to demonstrate full compliance with General Plan Program <br />2.2, the proposed project is required to comply with the recommendations <br />included in the Geotechnical Report.
The URL can be used to link to this page
Your browser does not support the video tag.