My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 127 <br />Operational GHG Emissions <br />To assess operational-related GHG emissions and their potential to cause a <br />significant impact, the proposed project is analyzed for its consistency with <br />the City’s CAP 2.0. As shown in the proposed project’s CAP 2.0 checklist, the <br />proposed project includes all applicable, mandatory measures required by <br />the City’s CAP 2.0, except for a battery storage back up system for solar <br />energy, the full number of EV parking spaces, and the full number of bicycle <br />parking spaces. First, although the proposed project would be otherwise <br />required to provide a battery storage back up system for the proposed solar <br />system under CAP 2.0, the proposed project has requested and would need <br />to obtain a waiver pursuant to the density bonus application. Although <br />Village 4 would otherwise require 102 EV parking spaces according to the <br />Pleasanton Municipal Code and CAP 2.0, the proposed project has <br />requested and would need to obtain a waiver pursuant to the density bonus <br />application and thus would meet all applicable CALGreen requirements. <br />Additionally, the proposed project would otherwise be required to provide <br />one short-term and one long-term bicycle parking space for every three <br />multi-family residential units; the applicant has requested and would need to <br />obtain a waiver pursuant to the density bonus application to provide two <br />spaces for every 50 units instead. As such, the proposed project would be <br />consistent with all applicable, mandatory requirements of the CAP 2.0. <br />Therefore, the proposed project is also consistent with the Housing Element <br />Update FEIR, which meets the requirements of Criterion B of BAAQMD’s 2022 <br />CEQA Thresholds of Significance. <br />In regard to demonstrating project consistency with applicable GHG plans, <br />the proposed project must be consistent with a local GHG reduction strategy <br />(Threshold B) or meet the minimum project design elements recommended <br />by BAAQMD (Threshold A). Threshold B is being applied to the analysis of this <br />project as the City has adopted a qualified CAP that includes a CAP <br />Consistency Checklist. <br />The City has a CAP, Housing Element Update, and enforces its building <br />codes, all of which aim to reduce GHG emissions. Therefore, if individual <br />projects conform to the CAP 2.0 and Housing Element Update, they would <br />not conflict with local plans, policies, or regulations applicable to GHG <br />emissions. Further, the Housing Element Update was shown to be consistent <br />with the applicable measures and actions of the CAP 2.0. As shown above, <br />the proposed project is consistent with the Housing Element Update and CAP <br />2.0. The proposed project would also be constructed in conformance with at
The URL can be used to link to this page
Your browser does not support the video tag.