Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />172 <br />Proposed Project Analysis and Conclusion <br />Construction <br />Construction of the proposed project would require a variety of large, steel- <br />tracked earthmoving vehicles for site preparation and the use of vibratory <br />rollers for internal street construction. According to the FTA, large bulldozers <br />and similar heavy equipment can generate groundborne vibration levels up <br />to 0.089 inches per second (in/sec) peak particle velocity (PPV) at a <br />reference distance of 25 feet. In other words, these vehicles could expose <br />buildings within 25 feet of their construction activities to groundborne <br />vibration levels up to 0.089 in/sec PPV. Small vibratory rollers produce <br />groundborne vibration levels ranging up to 0.101 in/sec PPV at 25 feet from <br />the operating equipment. <br />The nearest building to the project construction footprint is the self storage <br />office building located approximately 40 feet south of the nearest project <br />construction footprint where the heaviest construction equipment would <br />operate. At this distance, groundborne vibration levels from large bulldozers <br />and similar heavy grading vehicles operating near the proposed project’s <br />western property line would be approximately 0.099 in/sec PPV at the <br />façade. This is below the FTA’s damage threshold of 0.3 in/sec PPV for <br />structures of this type, a structure of concrete and masonry construction. <br />Therefore, groundborne vibration impacts from construction activities would <br />be less than significant. <br />Operations <br />Implementation of the proposed project would not include any permanent <br />sources that would expose persons in the project vicinity to groundborne <br />vibration levels that could be perceptible without instruments at any existing <br />sensitive land use in the project vicinity. In addition, there are no existing <br />significant permanent sources of groundborne vibration in the project vicinity <br />to which the proposed project would be exposed. Therefore, project <br />operational groundborne vibration level impacts would be considered less <br />than significant without mitigation. <br />Therefore, there are no environmental effects that are peculiar to the <br />proposed project. The proposed project would not result in a new or more <br />severe adverse impact that was not previously identified in the Housing <br />Element Update FEIR. Approval of the proposed project would not result in <br />any significant effects relating to project-related vibration, and the proposed <br />project would meet the criteria of CEQA Guidelines Section 15332(c).