My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 175 <br />• The project applicant shall enclose mechanical systems in a <br />sound-attenuating structure or shall install sound barriers <br />adjacent to the proposed system that would reduce <br />operational noise levels to not exceed the City’s noise <br />performance standards as measured at the property line. <br />• The project application shall relocate the proposed <br />mechanical system further from property line to reduce <br />operational noise levels to not exceed the City’s noise <br />performance standards as measured at the property line. <br /> <br />MM NOI-2 Construction Vibration Reduction Plan <br />For any future development projects that would use pile driving <br />within 200 feet of an off-site structure, prior to the issuance of <br />grading permits for a project, the project sponsor shall retain a <br />Noise Specialist to prepare a Construction Vibration Reduction <br />Plan for submittal to the City’s Planning Director for review and <br />approval that identifies specific techniques, such as the depth <br />and location of temporary trenching, that would reduce <br />potential vibration impacts to less than significant for any <br />impacted structures. Upon approval by the City, the <br />construction vibration reduction measures shall be incorporated <br />into the construction documents. A note shall be provided on <br />grading and building plans indicating that, during grading and <br />construction, the property owner/developer shall be responsible <br />for requiring contractors, to be monitored via on-site inspection <br />by the Community Development Department, to implement <br />these measures to limit construction-related vibration impacts. <br />For any future development projects that would necessitate the <br />use of large vibratory rollers within 30 feet of an off-site structure, <br />or the use of heavy construction equipment (i.e., construction <br />equipment with a peak particle velocity [PPV] at 25 feet [inches <br />per second] rating of 0.051 or greater as shown in Table 3.11-3 in <br />Section 3.11, Noise, in this Program EIR) within 15 feet of an off- <br />site structure, the project sponsor shall retain a Noise Specialist to <br />prepare a Construction Vibration Reduction Plan for submittal to <br />the City’s Director of Community Development for review and <br />approval that identifies specific techniques, such as the depth <br />and location of temporary trenching, that would reduce <br />potential vibration impacts to less than significant for any
The URL can be used to link to this page
Your browser does not support the video tag.