Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />174 <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. No mitigation measures from the Housing Element Update FEIR would <br />be required because the proposed project’s specific impacts would be <br />less than significant. <br /> <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM NOI-1 Stationary Source Noise Impact Reduction Measure <br />Prior to issuance for building permits for a project, for any <br />development project on potential sites for housing that would <br />include any noise-producing mechanical systems located within <br />25 feet of a property line, the project applicant shall retain a <br />Noise Specialist to conduct a site-specific project-level noise <br />analysis to evaluate compliance with Section 9.04.030 of the <br />Municipal Code, which prohibits noise levels in excess of 60 A- <br />weighted decibel (dBA) at any point outside the property plane, <br />as defined in Section 9.04.020 of the Municipal Code as “a <br />vertical plane including the property line which determines the <br />property boundaries in space.” If the analysis identifies that <br />proposed mechanical system operations could result in an <br />exceedance of this noise performance standard, then specific <br />measures to attenuate the noise impact shall be outlined in the <br />analysis. The analysis shall be submitted to the City’s Building and <br />Safety Division for review and approval prior to issuance of <br />building permits. The final noise reduction measures shall be <br />included on all final construction and building documents <br />and/or construction management plans and submitted for <br />verification to the City. Specific measures may include, but are <br />not limited to, the following measures or design features: <br />• The project applicant shall utilize quieter mechanical systems <br />that would not result in an exceedance of the City’s <br />operational noise standards.