My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 193 <br />F (over capacity conditions). LOS E corresponds to operations “at capacity.” <br />When volumes exceed capacity, stop-and-go conditions result, and <br />operations are designated LOS F. <br />Although LOS and other delay-based metrics cannot be used to determine <br />significant impacts under CEQA, the City strives to maintain a balanced <br />transportation system, which includes maintaining traffic operations within a <br />certain delay range, based on policies contained in the General Plan. <br />Additionally, a project’s effect on overall travel operations provides decision- <br />makers with additional information to consider in the entitlement process and <br />allows for the identification of potential improvements or project changes <br />that could minimize the overall transportation system effect of a project on <br />the surrounding community. <br />The City applies the following criteria to develop recommendations designed <br />to enhance mobility for all travel modes, including transit vehicles, without <br />degrading or precluding the provision of planned bicycle, pedestrian, and <br />transit facilities. Intersection or roadway improvements may be <br />recommended under the following circumstances: <br />• The project deteriorates the operations of a signalized intersection from <br />acceptable to unacceptable based on the LOS standard established in <br />the General Plan. <br />• The project adds 10 or more trips to an intersection projected to operate <br />at an unacceptable LOS E or LOS F prior to the addition of project <br />traffic. <br />• The project deteriorates the operations of a controlled movement at an <br />unsignalized intersection from LOS E or better to LOS F, or at intersections <br />where a controlled movement already operates at LOS F, one of the <br />following: <br />- Project traffic results in satisfaction of the peak-hour volume traffic <br />signal warrant; <br />- Project traffic increases minor movement delay by more than 30 <br />seconds; or <br />- Where the peak-hour volume signal warrant is met without project <br />traffic and delay cannot be measured, project increases traffic by 10 <br />or more vehicles per lane on the controlled approach. <br />• The addition of project traffic at a study intersection would result in the <br />95th percentile vehicle queue exceeding the available storage or <br />would increase 95th percentile queue by more than two vehicles (50
The URL can be used to link to this page
Your browser does not support the video tag.