My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 197 <br />Intersection Movement <br />Storage <br />Length (ft)1 <br />AM Peak <br />Period <br />PM Peak <br />Period <br />Notes: <br />1 An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through <br />lane, which is not reflected in the storage length above. <br />Bold text indicates queue potentially extends beyond available storage. <br />Source: Fehr & Peers, February 2025. <br /> <br />Existing with Project Conditions <br />Existing with Project Traffic Volumes <br />The project traffic volumes on Figure 6 of the TIA were added to the existing <br />traffic volumes from Figure 4 of the TIA to estimate the Existing with Project <br />traffic volumes, as shown on Figure 8 of the TIA. No improvements were <br />assumed at any of the study intersections. <br />Analysis of Existing with Project Conditions <br />Intersection Operations <br />The Existing with Project analysis results are presented in Table 9, based on the <br />traffic volumes and intersection configurations presented on Figure 8 of the <br />TIA, along with the results for Existing conditions. <br />Table 9: Existing with Project Conditions – Intersection Operations <br />Intersection Control1 <br />Peak- <br />hour2 <br />LOS <br />Standard <br />Existing <br />Existing with <br />Project <br />Delay3 LOS Delay3 LOS <br />1. Boulder Street <br />and Valley <br />Avenue <br />Signal AM <br />PM <br />D 7.3 <br />9.5 <br />A <br />A <br />11.8 <br />12.3 <br />B <br />B <br />2. Valley Avenue <br />and Busch Road <br />Signal AM <br />PM <br />D 15.4 <br />9.8 <br />B <br />A <br />16.7 <br />11.5 <br />B <br />B <br />3. Santa Rita Road <br />and Valley <br />Avenue <br />Signal AM <br />PM <br />D 33.7 <br />55.4 <br />C <br />E <br />34.5 <br />66.5 <br />C <br />E <br />4. Bernal <br />Avenue/Valley <br />Avenue and <br />Stanley <br />Boulevard <br />Signal AM <br />PM <br />D 38.1 <br />62.9 <br />D <br />E <br />39.2 <br />67.2 <br />D <br />E <br />5. Busch Road and <br />Ironwood Drive <br />Signal AM <br />PM <br />D 19 <br />21.8 <br />B <br />C <br />16.4 <br />16.3 <br />B <br />B
The URL can be used to link to this page
Your browser does not support the video tag.