My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 201 <br />widening of the intersection to include a third southbound left <br />turn lane and a second westbound left turn lane. With the <br />implementation of this improvement, the intersection would <br />function at an acceptable LOS. This improvement shall be <br />constructed with the proposed project’s development, with fees <br />credited to the developer. <br />Deficiency 2: The intersection of Bernal Avenue/Valley Avenue and Stanley <br />Boulevard operates at a deficient LOS E in the existing PM peak-hour. The <br />proposed project would add more than 10 vehicle trips, which based on the <br />General Plan/Operational Thresholds, would be considered significant. <br />COA 2: The proposed project shall provide funds for the optimization of <br />the traffic signal timing and phasing at this intersection prior to <br />issuance of certificate of occupancy. Implementation of this <br />measure would improve operations of the intersection for vehicle <br />movements to an acceptable level (LOS D with a delay of 40.8 <br />seconds per vehicle in the PM peak-hour). <br />Deficiency 3: To provide acceptable access, appropriate traffic operations <br />and pedestrian safety, improvements to the project’s intersection at Boulder <br />Street and Valley Avenue would be required. <br />COA 3: The project shall construct improvements to the Boulder <br />Street/Valley Avenue intersection prior to issuance of certificate <br />of occupancy. These shall include upgrading the traffic signal to <br />full 8-phase protected left turn operations with appropriate <br />pedestrian provisions. Two exit lanes shall be provided on the <br />proposed project’s approach including a separate left turn and <br />a shared through-right turn lane. <br />Cumulative Without El Charro Extension Traffic Conditions <br />This section discusses cumulative traffic conditions both without and with the <br />proposed project. The cumulative condition represents conditions in the 2040 <br />horizon year, based on forecasts from the City’s travel demand model. The <br />cumulative forecasts reflect conditions with buildout of the City’s General <br />Plan and the implementation of the recently approved Housing Element <br />Update. To evaluate the potential effect of traffic generated by the <br />proposed project on the surrounding street system, volume estimates <br />representing Cumulative without Project Conditions were prepared. Traffic <br />conditions without the project under this future scenario reflect traffic <br />increases due to nearby and regional development along with background
The URL can be used to link to this page
Your browser does not support the video tag.