My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />202 <br />roadway network changes and street improvements. Major cumulative land <br />use changes in the study area include substantial industrial and R&D space <br />with supporting retail on the parcel immediately east of the project site (TAZs <br />45 and 91) and north of Busch Road (TAZ 216). The cumulative analysis also <br />reflects the programmed General Plan roadway improvements including <br />changes at the Santa Rita Road/Valley Avenue intersection (addition of third <br />southbound left turn and second westbound left turn). The forecasted <br />Cumulative without Project Conditions traffic volumes were then used as the <br />baseline to identify the proposed project’s effects on the operations of the <br />circulation system. <br />Two different sets of cumulative traffic volumes have been prepared, <br />including forecasts both with and without the proposed El Charro Road <br />extension project. Cumulative conditions both with and without the <br />proposed project and with and without the El Charro Road extension project <br />have been evaluated. El Charro Road’s current terminus is at Stoneridge <br />Drive/West Jack London Boulevard and the extension project would extend <br />the road south, connecting to Stanley Boulevard. This project was proposed <br />in the 2005 Pleasanton General Plan Update and is included in the City’s <br />Traffic Impact Fee program. <br />Traffic volumes for the Cumulative without Project without the El Charro <br />Extension scenario are presented on Figure 9 of the TIA. Project traffic was <br />added to the Cumulative without Project forecasts to estimate the <br />Cumulative with Project without the El Charro Extension scenario, as <br />presented on Figure 10 of the TIA. <br />Analysis of Cumulative Without El Charro Extension Conditions <br />Intersection Operations <br />Cumulative without the El Charro Road extension scenarios both with and <br />without project-generated traffic were evaluated in the TIA, and the analysis <br />results are presented in Table 11, based on the traffic volumes and lane <br />configurations presented on Figure 8 and Figure 9 of the TIA. <br />The addition of project traffic would affect average delay at each of the <br />study intersections but would not degrade service levels. All study <br />intersections are projected to operate within the City’s established LOS <br />standard in the Cumulative without El Charro Extension condition, even with <br />the addition of project traffic.
The URL can be used to link to this page
Your browser does not support the video tag.