Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />206 <br />Cumulative Without El Charro Extension Condition Recommendations <br />Based on the results of the Cumulative without El Charro Extension with <br />Project analysis, one violation of the City’s policies was identified. <br />Deficiency 4: The queues in the southbound left turn lanes at the Bernal <br />Avenue/Valley Avenue/Stanley Boulevard intersection were found to exceed <br />the available storage in the Cumulative without El Charro Extension with <br />Project scenario. <br />Recommendation: Queues at the subject movement should be <br />monitored, and if found to exceed the available storage, the project <br />should make a fair share contribution toward the implementation of an <br />improvement measure. The improvement would be an extension of the <br />available storage in the southbound left turn lanes within the existing <br />landscaped median. <br />Cumulative With El Charro Extension Traffic Conditions <br />This section discusses cumulative traffic conditions with the El Charro Road <br />extension both with and without traffic that would be generated by the <br />proposed project. The cumulative conditions analysis considers development <br />within the City as described in the General Plan and recently adopted <br />Housing Element Update. Cumulative forecasts were developed using the <br />City of Pleasanton’s travel demand model. El Charro Road’s current terminus <br />is at Stoneridge Drive/West Jack London Boulevard and the roadway <br />extension project proposes to extend the road south, connecting to Stanley <br />Boulevard in the City of Pleasanton. This project was proposed in the 2005 <br />Pleasanton General Plan Update and is included in the City’s Traffic Impact <br />Fee program. As part of the cumulative with El Charro Extension scenarios, <br />Busch Road is assumed to be extended to El Charro where a new signalized <br />intersection would be constructed. <br />Analysis of Cumulative With El Charro Extension Conditions <br />Intersection Operations <br />In the With El Charro Extension scenario, cumulative without and with Project <br />intersection operations were evaluated in the TIA, and the analysis results are <br />presented in Table 13, based on traffic volumes presented on Figure 11 and <br />Figure 12 of the TIA. <br />The addition of project traffic would affect average delay at each of the <br />study intersections but would not degrade service levels. Without additional <br />improvements, the intersection of El Charro Extension and Stoneridge Drive is