Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />226 <br />Future development would be required to uphold the goals and objectives <br />of the General Plan and CAP 2.0 related to water facilities to ensure the <br />adequate water treatment and distribution systems are planned for, <br />concurrent with projected growth. Project proponents would be required to <br />fund their fair share of upgrading the utility infrastructure as needed to serve <br />a project. This may include installing water mains, new water meters, and/or <br />upgrades to existing facilities. The City would review individual development <br />projects at the time of application to establish requirements for funding any <br />infrastructure improvements necessary to mitigate project-specific impacts <br />that have not been previously identified as part of a capital improvement <br />program covered by development connection fees. Consistent with <br />applicable State law, the City’s development fees would ensure that the <br />developers pay the cost attributable to the increased demand for the <br />affected public facilities reasonably related to the development project to <br />maintain the existing LOS and achieve an adopted LOS that is consistent with <br />the General Plan and Municipal Code (California Government Code Section <br />66001(g)). Therefore, the Housing Element Update FEIR concluded that <br />impacts due to the extension, relocation, and expansion of new water <br />facilities would be less than significant. <br />Wastewater <br />The Housing Element Update FEIR indicated that the 2.17 mgd of wastewater <br />generated by new development consistent with the Housing Element Update <br />would represent less than 5 percent of total treatment capacity of the DSRSD <br />Regional Wastewater Treatment Facility (RWTF) and Livermore Water <br />Reclamation Plant (LWRP), and the RWTF and LWRP would have the capacity <br />to handle the increase in wastewater. <br />The City has entered into numerous sewage reservation agreements that <br />guarantee capacity to various properties/projects. Most approved, but not <br />yet constructed, commercial/office developments utilize capacity the City <br />has “reserved” for them out of its original sewage treatment plant and <br />wastewater discharge capacities. Because the City has secured both <br />treatment plant and export capacity by agreement with the DSRSD and its <br />participation in the Livermore-Amador Valley Water Management Agency <br />(LAVWMA) Expansion Project, sewage treatment and disposal capacity <br />would not be a constraint in the short- or mid-term. Therefore, the City has <br />secured capacity for its continued existing and future wastewater flows. In <br />addition, the City’s capacity in the discharge pipeline would allow growth in