My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 227 <br />dry weather flows as well as accommodate its wet weather flows for many <br />future years.37,38 <br />The Housing Element Update FEIR also indicated that future development <br />consistent with the Housing Element Update would be located within the <br />urban framework of the City and near existing wastewater infrastructure. The <br />City currently complies with the statutory requirements, as applicable (see <br />Section 3.15, Utilities and Service Systems, “Regulatory Framework” in the <br />Housing Element Update FEIR) including goals, programs, and policies in the <br />General Plan and Title 15 of the Municipal Code, and those requirements <br />ensure that the City would continue to comply with State and federal <br />regulatory requirements related to wastewater. New development would <br />also be subject to the latest adopted edition of the California Plumbing <br />Code and CALGreen, including the provisions for water efficient fixtures and <br />toilets. All new development would be required to pay a fair share of the <br />City’s planned sewer system improvements through connection fees and <br />capital facility fees. Therefore, the Housing Element Update FEIR concluded <br />that development consistent with the Housing Element Update would not <br />result in insufficient wastewater collection and treatment and no new or <br />expanded wastewater treatment facilities would be needed. Impacts would <br />be less than significant. <br />Stormwater Drainage Capacity <br />The Housing Element Update FEIR indicated that development projects under <br />the Housing Element Update would be required to comply with all applicable <br />City requirements related to stormwater drainage capacity. The General <br />Plan Chapter 8, Water Element, includes requirements for stormwater <br />facilities. Goal 6 requires projects to minimize stormwater runoff and provide <br />adequate stormwater facilities to protect property from flooding. Policy 8 <br />ensures an adequate storm drainage system to serve existing and future <br />development. Specifically, Program 8.4 requires the installation of on-site <br />storm drainage infrastructure that would improve local storm drainage <br />systems to accept appropriate design-year flows, as determined by the City <br />Engineer. Additional policies require reduction of stormwater runoff and <br />maximizing infiltration of naturally occurring rainwater to improve surface and <br />subsurface water quality, minimize impervious surfaces, and implement <br />stormwater runoff requirements. In addition, development consistent with the <br />Housing Element Update would be required to pay a fair share of the Zone <br /> <br />37 City of Pleasanton. 2019. Sewer System Management Plan. December. <br />38 City of Pleasanton. 2009. Pleasanton General Plan 2005-2025. Section 9—Water Element. July.
The URL can be used to link to this page
Your browser does not support the video tag.