My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />230 <br />The proposed project would drain into two separate sewer sheds: Boulder <br />Street and Lift Station 6 and Busch Road and the East Amador Lift Station. A <br />majority of the proposed project (235 single-family homes and 102 multi- <br />family homes) drain to Boulder Street and Lift Station 6, while 75 parcels drain <br />to Busch Road and the East Amador Lift Station sewer shed. <br />Boulder Street and Downstream Sewers <br />With the proposed project, the design storm PWWF flowing west along <br />Boulder Street, just downstream of the proposed project, is proposed to <br />increase from approximately 31,800 gpd to 124,100 gpd (a 289 percent <br />increase in total flow from existing conditions). Despite the significant <br />increase in flow, the analysis does not predict any capacity issues on Boulder <br />Street or Lift Station 4 during PWWF or PDWF scenarios. <br />The additional sewer flow does ultimately drain to Lift Station 6, which <br />experiences significant backup surcharge during PWWF events. The <br />additional flow from the development causes incrementally more backup at <br />Lift Station 6 and decreases the available freeboard upstream of Lift Station 6 <br />along Arroyo Mucho Trail and Hopyard Road during PWWF events. This in turn <br />increases the risk of an overflow at Lift Station 6. The City has recently <br />performed some maintenance on the pumps at Lift Station 6 to try to <br />improve lift station performance. However, updated testing has not been <br />performed, and the City should limit additional flow loading to Lift Station 6 <br />where possible to minimize further backup surcharge. <br />Busch Road and Downstream Sewers <br />With the proposed project and other expected future developments in the <br />East Pleasanton area, the design storm PWWF going west along Busch Road, <br />just downstream of the proposed project, is projected to increase from 27,900 <br />gpd to 223,300 gpd. The resulting flow can be conveyed by the existing <br />sewer along Busch Road to the Nobhill Siphon during PDWF. However, during <br />PWWF, the additional flow causes several pipes to surcharge on Stoneridge <br />Drive and Kamp Drive. <br />The sewer on Kamp and Stoneridge Drive was identified as a capacity <br />deficiency in the 2024 Sewer Capacity Evaluation Report (triggered by the <br />additional flow from other developments included in the evaluation) and an <br />improvement project was proposed (Capacity Project 4). The proposed <br />project would somewhat increase the surcharge identified as a capacity <br />deficiency. However, the proposed Capacity Project 4 would resolve the <br />capacity deficiency associated with the development when implemented.
The URL can be used to link to this page
Your browser does not support the video tag.