My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />234 <br />The proposed project would be required to comply with the City’s General <br />Plan Program 26.18, which requires residential projects with more than three <br />units to prepare and implement a Project Waste Diversion Plan. <br />Municipal Code Chapter 9.20 and Chapter 9.23 outline requirements for <br />recycling as well as organic waste reduction. The proposed project would be <br />required to be compliant with all California Health and Safety Code, <br />California Code of Regulations, California Public Resources Code, and CAP <br />2.0 policies and programs to reduce and divert solid waste during <br />construction and operation. Therefore, there are no environmental effects <br />that are peculiar to the proposed project. The proposed project would not <br />result in a new or more severe adverse impact that was not previously <br />identified in the Housing Element Update FEIR. <br />Conclusion <br />With regard to Utilities and Service Systems, the Consistency Checklist <br />demonstrates that: <br />1. No peculiar impacts related to the proposed project or its site have <br />been identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. The proposed project’s impacts are consistent with previously identified <br />significant and unavoidable impacts and, consistent with the Housing <br />Element Update FEIR, no feasible mitigation is available. <br /> <br />Mitigation Measures <br />None available. <br />Development consistent with the Housing Element Update would result in a <br />significant unavoidable impact with respect to water supply and the Housing <br />Element Update’s incremental contribution to the cumulative impact is <br />significant. Accordingly, in certifying the Housing Element Update FEIR, the <br />City made findings that there is no available feasible mitigation and impacts
The URL can be used to link to this page
Your browser does not support the video tag.