My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 233 <br />Would the project: d) Generate solid waste in excess of State or local standards, or in <br />excess of the capacity of local infrastructure, or otherwise <br />impair the attainment of solid waste reduction goals and <br /> e) Comply with federal, State, and local management and <br />reduction statutes and regulations related to solid waste. <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that the solid waste generated <br />by development consistent with the Housing Element Update would <br />represent less than .05 percent of the Vasco Road Landfill’s remaining <br />capacity. <br />Compliance with General Plan policies and programs, as well as CAP 2.0 <br />strategies, would reduce the generation of solid waste. Additionally, <br />construction and demolition debris from new development would be <br />required to be recycled (Municipal Code Chapter 9.21) and organics waste <br />reduced or recycled (Municipal Code Chapter 9.23). Statewide ordinances, <br />including AB 341, AB 939, and SB 1016 require waste reduction, recycling, <br />and diversion and would also be applicable to future development. <br />Construction waste would be temporary and would be required to be <br />diverted from landfills in accordance with Municipal Code Chapter 9.21, and <br />a Waste Management Plan must include waste diversion data for a <br />construction project. <br />The Housing Element Update FEIR concluded that there is sufficient permitted <br />capacity at the Vasco Road Landfill to accommodate the solid waste <br />generated by development consistent with the Housing Element Update. <br />Furthermore, as previously discussed, all future development consistent with <br />the Housing Element Update would be required to abide by and be <br />consistent with federal, State, and local statutes and regulations related to <br />solid waste, including the California Health and Safety Code, California Code <br />of Regulations, California Public Resources Code, General Plan, and <br />Municipal Code. Therefore, impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />As described in Section XIV, Population and Housing, the proposed project <br />would construct fewer units than what was assumed in the Housing Element <br />Update FEIR. Therefore, the proposed project would create less waste than <br />what was assumed in the Housing Element Update FEIR, and there would be <br />adequate landfill capacity to accommodate the proposed project.
The URL can be used to link to this page
Your browser does not support the video tag.