Laserfiche WebLink
City of Pleasanton <br />Villages at the Quarry Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 10 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480028/MMRP/21480028 Villages at the Quarry MMRP.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />ARBORIST.” A template sign is attached to this report. <br />Fencing to protect retained trees should be in place as <br />shown before any grading, construction or other site work <br />begins. <br />Fencing to protect retained trees must be in place as <br />shown before any grading, construction or other site <br />work past layout begins. Fencing shall remain in place <br />during the entire grading or construction phases and <br />shall not be moved by any subcontractor for any reason, <br />without approval of the Project Arborist. <br />COA BIO-3: Mulching Under Trees <br />Mulch is highly beneficial for trees being preserved. The <br />ideal, and by far the most beneficial supplemental or <br />replacement mulch for the trees, is chips from a tree <br />service. This mulch can be a permanent feature of the <br />landscape, and a maintained depth of four inches over as <br />much of the rootzone as is compatible is probably the <br />single most effective measure that can be taken to assure <br />health of the trees. <br />Mulch should gradually recede in depth from four inches <br />to zero within three feet of the trunk, as to not place <br />mulch directly against tree trunks. Decorative mulch may <br />be used instead of the natural mulch, but is far less <br />effective in maintaining tree health, and is typically much <br />more expensive. <br />Incorporation of <br />mulching under trees in <br />construction plans. <br /> <br /> <br /> <br />Field verification. <br />Prior to issuance of <br />grading permits. <br /> <br /> <br /> <br /> <br />Prior to approval of <br />map. <br />City of Pleasanton <br />Community <br />Development <br />Department, Planning <br />Division. <br /> <br />City of Pleasanton <br />Community <br />Development <br />Department, Planning <br />Division. <br /> <br />COA BIO-4: Valley Oak No. 581 <br />The property owner shall discuss potential impacts to <br />Valley Oak Number (No.) 581 and other trees immediately <br />south of the property boundary with the Project Arborist. <br />To help assure safe retention of the Valley Oak No. 581 <br />tree, all grading and construction work within its Critical <br />Root Zone (CRZ) shall be performed under Project <br />Submittal of <br />documentation of <br />impact discussion <br />related to Valley Oak <br />Number 581 and other <br />trees south of the <br />property boundary by <br />Prior to issuance of <br />grading or building <br />permits. <br /> <br /> <br /> <br /> <br />City of Pleasanton <br />Community <br />Development <br />Department, Planning <br />Division. <br /> <br /> <br />