My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P23-0480 & Tract 8680, 3300 Busch Road Planning Commission <br />22 of 29 <br />Boulder Street Extension <br />Boulder Street currently terminates at Valley Avenue on its eastern end. With construction of <br />the project, Boulder Street would be extended easterly into the project. A portion of the <br />new/proposed Boulder Street extension would traverse a piece of land currently owned by <br />Cubesmart, an existing self-storage facility. The applicant and Cubesmart have signed a <br />Conveyance Option Agreement detailing purchase terms. Staff has included a condition that <br />after the applicant obtains property rights from Cubesmart, said piece of land shall be <br />subsequently dedicated to the public for roadway and utility purposes prior to final map <br />approval. The applicant agrees to this condition. <br />Roadway Improvements <br />A Transportation Impact Analysis (TIA) has been prepared for the Project. The TIA analyzed <br />the Project in context with the Housing Element FEIR. The Project’s proposed density is <br />consistent with the density analyzed for the site in the Housing Element Update FEIR, which <br />analyzed and establishes mitigation measures, to the extent possible, to mitigate traffic and <br />circulation issues for this Housing Element site. <br /> <br />The City Traffic Engineer has reviewed the Project and Transportation Impact Analysis (TIA) <br />prepared for the Project. The TIA outlines the need for, and the Traffic Engineer requires <br />roadway and signal improvements to facilitate traffic flow and improve operations at the Project <br />site and at locations with anticipated traffic from the Project and allow for roadway and <br />intersection operations that meet the City’s standards. Specifically, roadway improvements will <br />be required through conditions of approval at the following locations: <br /> <br />1. Boulder Street/Valley Avenue intersection (COA NO. 142). The required improvements <br />include upgrading the traffic signal to full 8-phase protected left-turn operations with <br />appropriate pedestrian provisions. Two exit lanes should be provided on the project’s <br />approach including a separate left turn and a shared through-right turn lane. <br />2. Santa Rita Road/Valley Avenue intersection (COA NO. 143). The required <br />improvements at this intersection include the widening of the intersection to include a <br />third southbound left turn lane and a second westbound left turn lane. In addition, the <br />westbound left turn pockets shall be extended. <br />3. Busch Road/Valley Avenue intersection (COA NO. 144). The north leg of the <br />intersection will be modified to provide a marked crosswalk across Valley Avenue <br />including new ADA ramps and pedestrian push button. <br />4. Busch Road/Ironwood Drive intersection (COA NO. 144). The west leg of the <br />intersection will be modified to provide a marked crosswalk across Busch Road <br />including new ADA ramps and pedestrian push buttons. <br />5. Busch Road (COA NO. 145). Project shall construct Busch Road along the entirety of <br />the Project frontage as required by Section 19.36.050 of the Pleasanton Municipal Code <br />and shown previously in Figure 5. This design will include a single-lane roundabout <br />which is the appropriate means of traffic control and will provide traffic calming and safe <br />and efficient operation of the intersection of Busch Road and Street D . <br /> <br />Staff notes the City and the Project applicant are not in agreement about the requirement to <br />construct certain of the above-noted improvements, specifically the requirement to construct <br />improvements at Santa Rita/Valley; and the roundabout at Busch Road/Street D. However, the <br />City Traffic Engineer has determined such requirements to be fully supported by the TIA, and <br />provisions of the TIA. Notably, the Conditions specify eligibility for fee credits and (if
The URL can be used to link to this page
Your browser does not support the video tag.