<br />P23-0480 & Tract 8680, 3300 Busch Road Planning Commission <br />22 of 29 <br />Boulder Street Extension <br />Boulder Street currently terminates at Valley Avenue on its eastern end. With construction of <br />the project, Boulder Street would be extended easterly into the project. A portion of the <br />new/proposed Boulder Street extension would traverse a piece of land currently owned by <br />Cubesmart, an existing self-storage facility. The applicant and Cubesmart have signed a <br />Conveyance Option Agreement detailing purchase terms. Staff has included a condition that <br />after the applicant obtains property rights from Cubesmart, said piece of land shall be <br />subsequently dedicated to the public for roadway and utility purposes prior to final map <br />approval. The applicant agrees to this condition. <br />Roadway Improvements <br />A Transportation Impact Analysis (TIA) has been prepared for the Project. The TIA analyzed <br />the Project in context with the Housing Element FEIR. The Project’s proposed density is <br />consistent with the density analyzed for the site in the Housing Element Update FEIR, which <br />analyzed and establishes mitigation measures, to the extent possible, to mitigate traffic and <br />circulation issues for this Housing Element site. <br /> <br />The City Traffic Engineer has reviewed the Project and Transportation Impact Analysis (TIA) <br />prepared for the Project. The TIA outlines the need for, and the Traffic Engineer requires <br />roadway and signal improvements to facilitate traffic flow and improve operations at the Project <br />site and at locations with anticipated traffic from the Project and allow for roadway and <br />intersection operations that meet the City’s standards. Specifically, roadway improvements will <br />be required through conditions of approval at the following locations: <br /> <br />1. Boulder Street/Valley Avenue intersection (COA NO. 142). The required improvements <br />include upgrading the traffic signal to full 8-phase protected left-turn operations with <br />appropriate pedestrian provisions. Two exit lanes should be provided on the project’s <br />approach including a separate left turn and a shared through-right turn lane. <br />2. Santa Rita Road/Valley Avenue intersection (COA NO. 143). The required <br />improvements at this intersection include the widening of the intersection to include a <br />third southbound left turn lane and a second westbound left turn lane. In addition, the <br />westbound left turn pockets shall be extended. <br />3. Busch Road/Valley Avenue intersection (COA NO. 144). The north leg of the <br />intersection will be modified to provide a marked crosswalk across Valley Avenue <br />including new ADA ramps and pedestrian push button. <br />4. Busch Road/Ironwood Drive intersection (COA NO. 144). The west leg of the <br />intersection will be modified to provide a marked crosswalk across Busch Road <br />including new ADA ramps and pedestrian push buttons. <br />5. Busch Road (COA NO. 145). Project shall construct Busch Road along the entirety of <br />the Project frontage as required by Section 19.36.050 of the Pleasanton Municipal Code <br />and shown previously in Figure 5. This design will include a single-lane roundabout <br />which is the appropriate means of traffic control and will provide traffic calming and safe <br />and efficient operation of the intersection of Busch Road and Street D . <br /> <br />Staff notes the City and the Project applicant are not in agreement about the requirement to <br />construct certain of the above-noted improvements, specifically the requirement to construct <br />improvements at Santa Rita/Valley; and the roundabout at Busch Road/Street D. However, the <br />City Traffic Engineer has determined such requirements to be fully supported by the TIA, and <br />provisions of the TIA. Notably, the Conditions specify eligibility for fee credits and (if