Laserfiche WebLink
<br />P23-0480 & Tract 8680, 3300 Busch Road Planning Commission <br />21 of 29 <br />Woodard & Curran modeled sewer flows under peak wet weather flow (PWWF) conditions for <br />the two proposed connection points, one at Boulder Street that will serve 337 residential units, <br />and one at Busch Road that will serve 75 units. The study found, despite an increase in <br />PWWF, that proposed Boulder Street connection will not result in downstream capacity issues. <br /> <br />In contrast, results for the Busch Road connection indicate that downstream sewers will be <br />adversely impacted. In particular, flows north through the existing Kamp Drive neighborhood <br />will exacerbate a known problem titled “Capacity Project 4” in the City -wide master plan. <br /> <br />The master plan estimated a project cost of $2,019,000 to construct Capacity Project 4. <br />Woodard & Curran calculated the cost attributable to new customers, only including those from <br />the project. The portion of the costs directly attributable to the project was estimated to be <br />$222,275 or 11 percent of the total project cost. Staff discussed the proportional cost share <br />with the applicant who agreed to pay this amount as their fair share of Capacity Project 4. <br /> <br />Akel Engineering Group, Inc. prepared a Hydraulic Analysis to model domestic water demands <br />from the proposed development. The analysis evaluated the existing and proposed pipelines <br />relative to domestic and fire service demands. The analysis recommends a se cond service <br />connection between Lots 30 and 31 to ensure “supply reliability and redundancy for these <br />homes if one of the supply mains is out of service”, a feature now added to the project. The <br />analysis also evaluated the relocation of an existing water pipeline extending through the <br />project site to Pleasanton Garbage Service (PGS). The relocated pipeline has been included in <br />the project utility design. <br /> <br />Stormwater flows were evaluated by City staff. The proposed stormwater pipe network <br />conveys flows to bioretention areas located along Valley Avenue and Busch Road. These <br />areas will be designed to store and treat the water before discharge to the City’s sto rm <br />drainage system. Larger storm events will bypass the treatment system and flow directly to the <br />drainage system to prevent flooding. <br /> <br />Typical Public Street Designs <br />All streets within the development except for alleys in Village 1 are public streets. In addition to <br />vehicle travel lanes, they generally include an approximately 5-foot-wide planting area coupled <br />with an approximately 5-foot-wide sidewalk. <br /> <br />Homes fronting streets would have a minimum front yard setback of approximately 10 feet to <br />the home and approximately 18 feet to the garage. On-street parking is allowed when feasible <br />and possible. The civil plans show a cross-section for each street and Figure 14 shows typical <br />cross-section for an approximately 49-foot-wide public ROW and an approximately <br />56-foot-wide public ROW: <br /> <br />Figure 14: Street Cross Sections <br /> <br />